THE EXPORT PROCESSING ZONES REGULATIONS, 1991
1. |
These Regulations may be cited as the Export Processing Zones Regulations, 1991.
|
2. |
An application to the Authority for the designation of any area of Kenya as an export processing zone shall be in writing and contain the following particulars—
(a) |
the land reference number for the area together with a site map showing the immediate surroundings of the site;
|
(b) |
the area of the site in hectares; and
|
(c) |
the layout of on-site infrastructure facilities including roads, water pipes, sewage pipes and the area taken up by such facilities in hectares.
|
|
3. |
An export processing zone developer shall, when designing an export processing zone for the purposes of the Act and before initiating operations, ensure that the following standards are met—
(a) |
the road reserves shall, unless otherwise determined by the Authority, meet the following criteria—
|
(b) |
all roads comply with the standards for pavement thickness specified by the Minister for the time being responsible for public works; and is adequate to carry container traffic;
|
(c) |
the power supply shall be 11 KV;
|
(d) |
maintain a water supply of 25 cubic metres per day;
|
(e) |
maintain a minimum distance of six metres between the fence boundary wall of the export processing zone and the adjoining building;
|
(f) |
adequate security arrangement shall be provided by way of a heavy duty fence or a boundary wall with adequate illumination on the boundary;
|
(g) |
adequate area for custom check points at the gates shall be provided and adequate facilities for customs officers and examination stations (holding area) made available;
|
(h) |
adequate working areas for industrial labour with indispensable basic services and infrastructure which conform to modern practices and generally accepted architectural standards shall be provided; and
|
(i) |
any other standards that may be determined by the Authority.
|
|
4. |
The export processing zone licence shall be in Form EPD (1) set out in the Schedule.
|
5. |
(1) An application for an export processing zone developer or operator licence shall be in Form EPZD (1) set out in the Schedule.
(2) |
Once the application is approved for the designation of an area as an export processing zone, the developer shall develop the site designated for the export processing zone in accordance with the guidelines prescribed by the Authority within a period of two years.
|
(3) |
The export processing zone developer’s licence shall be in Form EPD (2) set out in the Schedule and shall be issued after the applicant has established the infrastructure facilities required by the Authority.
|
|
6. |
An export processing zone developer shall file a quarterly report to the Authority in Form EPZD (2) set out in the Schedule.
|
7. |
An application for the export processing zone enterprise licence shall be in Form EPZE (1) for manufacturing and EPZE (2) for commercial purposes set out in the Schedule and shall be addressed to the Chief Executive.
|
8. |
The Export Processing Zone Enterprise Licence shall be in Form EPD (3) set out in the Schedule.
|
9. |
(1) Every enterprise in the export processing zone shall keep at its place of business or premises and maintain in a form and manner conforming to accepted accounting standards the following—
(a) |
a stock book in which shall be entered the quantity and description of all raw materials used for manufacture, the quantity and description of semi-finished products, and the manner of their disposal;
|
(b) |
a register in which shall be entered the quantity and description of all raw materials used for manufacture, the quantity and description of semi-finished products, and the manner of their disposal;
|
(c) |
a stock book for recording particulars of waste materials resulting from manufacture;
|
(d) |
books of account, invoices, customs permits and other documents connected with the manufacturing operations; and
|
(e) |
a record of the description and quantity of physical loss resulting from evaporation, spillage, leakage, or other causes.
|
(2) |
Only one common set of records may be maintained if the enterprise so wishes, to satisfy requirements of the Authority and the Customs.
|
|
10. |
Every enterprise in the export processing zone shall produce on demand at any time for the inspection of an officer of the Authority the books, records and documents referred to in regulation 9 and shall allow such officer to make extracts therefrom, for the Authority’s own record or reference.
|
11. |
(1) Every enterprise in an export processing zone shall submit not later than the fourteenth day of January, April, July and October to the Authority a return in such a form as the Authority may prescribe giving details of—
(a) |
all raw materials received at the place or premises of manufacture during the preceding month;
|
(b) |
production of semi-finished and finished products including by-products and their releases for local consumption and for export;
|
(c) |
waste stocks and the manner of their disposal;
|
(d) |
loss through spillage, evaporation and other causes; and
|
(e) |
the balances of all raw materials and of the semi-finished products including by-products stocked at the place or premises of manufacture as at the close of business on the last day of the month.
|
(2) |
Every enterprise in an export processing zone shall complete and submit in triplicate to the Authority the Annual Survey of Export Processing Zone (Form AS 1) and return the completed forms by the date to be indicated by the Authority.
|
(3) |
The Authority shall forward a copy each to the Bureau of Statistics and the Ministry of Industry.
|
|
12. |
Every enterprise in the export processing zone shall furnish on demand as and when the Authority deems necessary any other information in the form of returns in the manner as may be prescribed by the Authority, and all such information shall be treated as confidential.
|
13. |
No raw materials, semi-finished or finished products may be destroyed in an export processing zone unless in the presence of an authorized customs officer.
|
14. |
When commodities of an enterprise are brought in or out of an export processing zone, application for approval shall be filed with the authorized customs official and the customs procedures as specified by the Customs Department shall be complied with.
|
15. |
(1) All enterprises shall submit complete name lists of their employees, with photographs, to the Authority through the developer and on the resignation of its employees, the enterprise shall inform the Authority through the developer for purposes of deletion from the original list submitted.
(2) |
Each developer or operator shall issue to the employees mentioned in paragraph (1), an identification card carrying a photograph which shall serve the purpose of a permanent entry and exit pass and the pass shall be in Form EPZ Pass (1).
|
(3) |
When entering or leaving an export processing zone, all persons shall be required to show their entry and exit passes to the security guards for examination.
|
(4) |
All visitors shall apply to the developer or operator for temporary (of duration not exceeding seven days) entry and exit passes before entering an export processing zone; and all such temporary passes shall be presented to the guards upon departure of such persons or vehicles from the zone.
|
(5) |
In case of loss of the permanent entry and exit passes issued by the Authority, the persons concerned shall immediately report such a loss to the Authority and, if it is found that the loss is true and the causes given are acceptable, the developer or operator shall, with approval of the Authority, issue a new pass and the old pass shall be deemed cancelled.
|
(6) |
Entry into and exit from an export processing zone by all persons and vehicles shall be made at specific points designated by the Authority.
|
(7) |
All the enterprises and other agencies inside an export processing zone shall exercise the due supervision of their employees to abide by the rules and regulations enforced in the Zone.
|
|
THE EXPORT PROCESSING ZONES REGULATIONS, 1991
1. |
These Regulations may be cited as the Export Processing Zones Regulations, 1991.
|
2. |
An application to the Authority for the designation of any area of Kenya as an export processing zone shall be in writing and contain the following particulars—
(a) |
the land reference number for the area together with a site map showing the immediate surroundings of the site;
|
(b) |
the area of the site in hectares; and
|
(c) |
the layout of on-site infrastructure facilities including roads, water pipes, sewage pipes and the area taken up by such facilities in hectares.
|
|
3. |
An export processing zone developer shall, when designing an export processing zone for the purposes of the Act and before initiating operations, ensure that the following standards are met—
(a) |
the road reserves shall, unless otherwise determined by the Authority, meet the following criteria—
|
(b) |
all roads comply with the standards for pavement thickness specified by the Minister for the time being responsible for public works; and is adequate to carry container traffic;
|
(c) |
the power supply shall be 11 KV;
|
(d) |
maintain a water supply of 25 cubic metres per day;
|
(e) |
maintain a minimum distance of six metres between the fence boundary wall of the export processing zone and the adjoining building;
|
(f) |
adequate security arrangement shall be provided by way of a heavy duty fence or a boundary wall with adequate illumination on the boundary;
|
(g) |
adequate area for custom check points at the gates shall be provided and adequate facilities for customs officers and examination stations (holding area) made available;
|
(h) |
adequate working areas for industrial labour with indispensable basic services and infrastructure which conform to modern practices and generally accepted architectural standards shall be provided; and
|
(i) |
any other standards that may be determined by the Authority.
|
|
4. |
The export processing zone licence shall be in Form EPD (1) set out in the Schedule.
|
5. |
(1) An application for an export processing zone developer or operator licence shall be in Form EPZD (1) set out in the Schedule.
(2) |
Once the application is approved for the designation of an area as an export processing zone, the developer shall develop the site designated for the export processing zone in accordance with the guidelines prescribed by the Authority within a period of two years.
|
(3) |
The export processing zone developer’s licence shall be in Form EPD (2) set out in the Schedule and shall be issued after the applicant has established the infrastructure facilities required by the Authority.
|
|
6. |
An export processing zone developer shall file a quarterly report to the Authority in Form EPZD (2) set out in the Schedule.
|
7. |
An application for the export processing zone enterprise licence shall be in the following forms set out in the First Schedule, Form EPZE (1) for manufacturing, EPZE (2) for commercial purposes and EPZE (3) for services.
[L.N. 233/1995, r. 2 (a).]
|
8. |
The Export Processing Zone Enterprise Licence shall be in Form EPD (3) set out in the Schedule.
|
9. |
(1) Every enterprise in the export processing zone shall keep at its place of business or premises and maintain in a form and manner conforming to accepted accounting standards the following—
(a) |
a stock book in which shall be entered the quantity and description of all raw materials used for manufacture, the quantity and description of semi-finished products, and the manner of their disposal;
|
(b) |
a register in which shall be entered the quantity and description of all raw materials used for manufacture, the quantity and description of semi-finished products, and the manner of their disposal;
|
(c) |
a stock book for recording particulars of waste materials resulting from manufacture;
|
(d) |
books of account, invoices, customs permits and other documents connected with the manufacturing operations; and
|
(e) |
a record of the description and quantity of physical loss resulting from evaporation, spillage, leakage, or other causes.
|
(2) |
Only one common set of records may be maintained if the enterprise so wishes, to satisfy requirements of the Authority and the Customs.
|
|
10. |
Every enterprise in the export processing zone shall produce on demand at any time for the inspection of an officer of the Authority the books, records and documents referred to in regulation 9 and shall allow such officer to make extracts therefrom, for the Authority’s own record or reference.
|
11. |
(1) Every enterprise in an export processing zone shall submit not later than the fourteenth day of January, April, July and October to the Authority a return in such a form as the Authority may prescribe giving details of—
(a) |
all raw materials received at the place or premises of manufacture during the preceding month;
|
(b) |
production of semi-finished and finished products including by-products and their releases for local consumption and for export;
|
(c) |
waste stocks and the manner of their disposal;
|
(d) |
loss through spillage, evaporation and other causes; and
|
(e) |
the balances of all raw materials and of the semi-finished products including by-products stocked at the place or premises of manufacture as at the close of business on the last day of the month.
|
(2) |
Every enterprise in an export processing zone shall complete and submit in triplicate to the Authority the Annual Survey of Export Processing Zone (Form AS 1) and return the completed forms by the date to be indicated by the Authority.
|
(3) |
The Authority shall forward a copy each to the Bureau of Statistics and the Ministry of Industry.
|
|
12. |
Every enterprise in the export processing zone shall furnish on demand as and when the Authority deems necessary any other information in the form of returns in the manner as may be prescribed by the Authority, and all such information shall be treated as confidential.
|
13. |
No raw materials, semi-finished or finished products may be destroyed in an export processing zone unless in the presence of an authorized customs officer.
|
14. |
When commodities of an enterprise are brought in or out of an export processing zone, application for approval shall be filed with the authorized customs official and the customs procedures as specified by the Customs Department shall be complied with.
|
15. |
(1) All enterprises shall submit complete name lists of their employees, with photographs, to the Authority through the developer and on the resignation of its employees, the enterprise shall inform the Authority through the developer for purposes of deletion from the original list submitted.
(2) |
Each developer or operator shall issue to the employees mentioned in paragraph (1), an identification card carrying a photograph which shall serve the purpose of a permanent entry and exit pass and the pass shall be in Form EPZ Pass (1).
|
(3) |
When entering or leaving an export processing zone, all persons shall be required to show their entry and exit passes to the security guards for examination.
|
(4) |
All visitors shall apply to the developer or operator for temporary (of duration not exceeding seven days) entry and exit passes before entering an export processing zone; and all such temporary passes shall be presented to the guards upon departure of such persons or vehicles from the zone.
|
(5) |
In case of loss of the permanent entry and exit passes issued by the Authority, the persons concerned shall immediately report such a loss to the Authority and, if it is found that the loss is true and the causes given are acceptable, the developer or operator shall, with approval of the Authority, issue a new pass and the old pass shall be deemed cancelled.
|
(6) |
Entry into and exit from an export processing zone by all persons and vehicles shall be made at specific points designated by the Authority.
|
(7) |
All the enterprises and other agencies inside an export processing zone shall exercise the due supervision of their employees to abide by the rules and regulations enforced in the Zone.
|
|
THE EXPORT PROCESSING ZONES REGULATIONS
1. |
These Regulations may be cited as the Export Processing Zones Regulations.
|
2. |
An application to the Authority for the designation of any area of Kenya as an export processing zone shall be in writing and contain the following particulars—
(a) |
the land reference number for the area together with a site map showing the immediate surroundings of the site;
|
(b) |
the area of the site in acres; and
|
(c) |
the layout of on-site infrastructure facilities including roads, water pipes, sewage pipes and the area taken up by such facilities in acres.
|
|
3. |
An export processing zone developer shall, when designing an export processing zone for the purposes of the Act and before initiating operations, ensure that the following standards are met—
(a) |
the road reserves shall, unless otherwise determined by the Authority, meet the following criteria—
|
|
|
|
Linear measurements in metres
|
|
(i)
|
arterial access or carriageway................................
|
24.0m
|
|
(ii)
|
internal access road .............................
|
20.0m
|
|
(iii)
|
minor access roads ...............................
|
15.0m
|
|
(iv)
|
Side roads and backlanes .........................
|
9.0m
|
(b) |
all roads comply with the standards for pavement thickness specified by the Cabinet Secretary for the time being responsible for public works; and is adequate to carry container traffic;
|
(c) |
the power supply shall be 11 KV;
|
(d) |
maintain a water supply of 25 cubic metres per day;
|
(e) |
maintain a minimum distance of six metres between the fence boundary wall of the export processing zone and the adjoining building;
|
(f) |
adequate security arrangement shall be provided by way of a heavy duty fence or a boundary wall with adequate illumination on the boundary;
|
(g) |
adequate area for custom check points at the gates shall be provided and adequate facilities for customs officers and examination stations (holding area) made available;
|
(h) |
adequate working areas for industrial labour with indispensable basic services and infrastructure which conform to modern practices and generally accepted architectural standards shall be provided; and
|
(i) |
any other standards that may be determined by the Authority.
|
|
4. |
The export processing zone licence shall be in Form EPD (1) set out in the Schedule.
|
5. |
(1) An application for an export processing zone developer or operator licence shall be in Form EPZD (1) set out in the Schedule.
|
(2) |
Once the application is approved for the designation of an area as an export processing zone, the developer shall develop the site designated for the export processing zone in accordance with the guidelines prescribed by the Authority within a period of two years.
|
(3) |
The export processing zone developer’s licence shall be in Form EPD (2) set out in the Schedule and shall be issued after the applicant has established the infrastructure facilities required by the Authority.
|
6. |
An export processing zone developer shall file a quarterly report to the Authority in Form EPZD (2) set out in the Schedule.
|
7.An |
application for the export processing zone enterprise licence shall be in Form EPZE (1) for manufacturing and EPZE (2) for commercial purposes set out in the Schedule and shall be addressed to the Chief Executive.
|
8. |
The Export Processing Zone Enterprise Licence shall be in Form EPD (3) set out in the Schedule.
|
9. |
(1) Every enterprise in the export processing zone shall keep at its place of business or premises and maintain in a form and manner conforming to accepted accounting standards the following—
(a) |
a stock book in which shall be entered the quantity and description of all raw materials used for manufacture, the quantity and description of semi-finished products, and the manner of their disposal;
|
(b) |
a register in which shall be entered the quantity and description of all raw materials used for manufacture, the quantity and description of semi-finished products, and the manner of their disposal;
|
(c) |
a stock book for recording particulars of waste materials resulting from manufacture;
|
(d) |
books of account, invoices, customs permits and other documents connected with the manufacturing operations; and
|
(e) |
a record of the description and quantity of physical loss resulting from evaporation, spillage, leakage, or other causes.
|
|
(2) |
Only one common set of records may be maintained if the enterprise so wishes, to satisfy requirements of the Authority and the Customs.
|
10. |
Every enterprise in the export processing zone shall produce on demand at any time for the inspection of an officer of the Authority the books, records and documents referred to in regulation 9 and shall allow such officer to make extracts therefrom, for the Authority’s own record or reference.
|
11. |
(1) Every enterprise in an export processing zone shall submit not later than the fourteenth day of January, April, July and October to the Authority a return in such a form as the Authority may prescribe giving details of—
(a) |
all raw materials received at the place or premises of manufacture during the preceding month;
|
(b) |
production of semi-finished and finished products including by-products and their releases for local consumption and for export;
|
(c) |
waste stocks and the manner of their disposal;
|
(d) |
loss through spillage, evaporation and other causes; and
|
(e) |
the balances of all raw materials and of the semi-finished products including by-products stocked at the place or premises of manufacture as at the close of business on the last day of the month.
|
|
(2) |
Every enterprise in an export processing zone shall complete and submit in triplicate to the Authority the Annual Survey of Export Processing Zone (Form AS 1) and return the completed forms by the date to be indicated by the Authority.
|
(3) |
The Authority shall forward a copy each to the Bureau of Statistics and the Ministry of Industry.
|
12. |
Every enterprise in the export processing zone shall furnish on demand as and when the Authority deems necessary any other information in the form of returns in the manner as may be prescribed by the Authority, and all such information shall be treated as confidential.
|
13. |
No raw materials, semi-finished or finished products may be destroyed in an export processing zone unless in the presence of an authorized customs officer.
|
14. |
When commodities of an enterprise are brought in or out of an export processing zone, application for approval shall be filed with the authorized customs official and the customs procedures as specified by the Customs Department shall be complied with.
|
15. |
(1) All enterprises shall submit complete name lists of their employees, with photographs, to the Authority through the developer and on the resignation of its employees, the enterprise shall inform the Authority through the developer for purposes of deletion from the original list submitted.
|
(2) |
Each developer or operator shall issue to the employees mentioned in paragraph (1), an identification card carrying a photograph which shall serve the purpose of a permanent entry and exit pass and the pass shall be in Form EPZ Pass (1).
|
(3) |
When entering or leaving an export processing zone, all persons shall be required to show their entry and exit passes to the security guards for examination.
|
(4) |
All visitors shall apply to the developer or operator for temporary (of duration not exceeding seven days) entry and exit passes before entering an export processing zone; and all such temporary passes shall be presented to the guards upon departure of such persons or vehicles from the zone.
|
(5) |
In case of loss of the permanent entry and exit passes issued by the Authority, the persons concerned shall immediately report such a loss to the Authority and, if it is found that the loss is true and the causes given are acceptable, the developer or operator shall, with approval of the Authority, issue a new pass and the old pass shall be deemed cancelled.
|
(6) |
Entry into and exit from an export processing zone by all persons and vehicles shall be made at specific points designated by the Authority.
|
(7) |
All the enterprises and other agencies inside an export processing zone shall exercise the due supervision of their employees to abide by the rules and regulations enforced in the Zone.
|
FIRST SCHEDULE
FORMS
FORM EPZE (1)
|
THE EXPORT PROCESSING ZONES ACT
|
(Cap. 517)
|
APPLICATION FOR EXPORT PROCESSING ZONE DEVELOPER/OPERATOR’SLICENCE
|
|
_____________________________________________________________________________________________________________A. Particulars of Applicant/Company_____________________________________________________________________________________________________________
|
1.
|
(i) Name of Applicant ..............................................................
|
|
(ii) Address of Applicant .........................................................
|
|
(iii) Telephone No. ....................................................................
|
|
|
2.
|
(i) Name of Company which will act as the Developer ............................
|
|
(ii) Date of incorporation of company ............................................................
|
|
(iii) Address of registered office ....................................................................
|
|
(iv) Telephone No. ...........................................................................................
|
|
|
3.
|
(i) Name of Company which will act as the Operator: ...........................
|
|
(ii) Date of incorporation of company ......................................................
|
|
(iii) Address of the Company: ..................................................................
|
|
(iv) Telephone No.: ..........................................................................................
|
B. PARTICULARS OF DIRECTORS
1. |
APPLICANT:
Name
|
Identity Card No./ Passport No.
|
Nationality
|
Residential Address
|
.......
|
|
|
|
|
3. |
OPERATOR:
C. PARTICULARS OF SHAREHOLDERS
|
1. |
APPLICANT:
Name
|
No. of shares
|
value of shares
|
Percentageshareholding
|
.......
|
|
|
|
|
3. |
OPERATOR:
D. PARTICULARS OF MANAGERS EMPLOYED
Name
|
Designation
|
Qualifications and Experience
|
.............
|
|
|
E. PROJECT DESCRIPTION
__________________________________________________________________________________________
|
1. |
Location: (L.R. No. and other details)
__________________________________________________________________________________________
|
2. |
Concept of the Export Processing Zone
(Manufacturing/Commercial : Services to be provided by the Developer/Operator/size of each unit/factory planned, space leased/land sold etc.).
__________________________________________________________________________________________
|
3. |
Agreement Between the Developer and Operator
(Terms of the Agreement)
__________________________________________________________________________________________
|
4. |
Zone Ownership:
Title to land, buildings, lease arrangements,
__________________________________________________________________________________________
|
5. |
Licences/Approvals Held:
(a) Gazette Notice No. designating the proposed location as an EPZ :
(copy to be provided)
(b) Developer's licence No. :
__________________________________________________________________________________________
|
6. |
Licences Applied:
(a) Developer's Licence :
(Yes/No)
(b) Operator Licence :
(Yes/No)
__________________________________________________________________________________________
|
7. |
Promotion Strategy and Expected Occupancy Rates of the Zone:
__________________________________________________________________________________________
F. PARTICULARS OF FINANCIAL CONDITION:
__________________________________________________________________________________________
(a) Proposed Paid-up share capital :
(i) Foreign:
(ii) Kenyan:
(iii) Total:
(b) Loan Capital:
(i) Amount :
(ii) Source :
(iii) Status of Commitment of Loan Capital by proposed source :
__________________________________________________________________________________________
DECLARATION
__________________________________________________________________________________________
I hereby declare that to the best of my knowledge and belief all the particulars furnished in this application are true.
|
|
......................................................
|
|
|
Signature of the Applicant
|
|
|
.................................................
|
|
|
Name in Block Letters
|
|
|
..........................................................
|
Date .............................................
|
|
Designation in Company
|
|
_________________________________________________
FORM: EPZD (2)
THE EXPORT PROCESSING ZONE ACT
|
(Cap. 517)
|
QUARTERLY REPORT BY DEVELOPERS/OPERATORS
|
_________________________________________________________________________________________________________1. Name and address of the Export Processing Zone._________________________________________________________________________________________________________
|
|
|
|
|
|
|
_________________________________________________________________________________________________________2. Name and address of the Export Processing Zone Developer/Operator.________________________________________________________________________________________________________
|
|
|
|
3. List of EPZ Enterprises operating in the zone.
|
|
Name
|
Licence No.
|
|
Operational
Non-operational
|
|
1. ..........................................................
|
...............................................................
|
|
...............................................................
|
|
2. ........................................................
|
.................................................................
|
|
..................................................
|
|
3. ......................................................
|
.................................................................
|
|
..................................................
|
|
4. .........................................................
|
...............................................................
|
|
..................................................
|
|
5. ......................................................
|
........................................................
|
|
..................................................
|
|
6. ........................................................
|
........................................................
|
|
..................................................
|
|
7. ........................................................
|
........................................................
|
|
..................................................
|
|
8. ........................................................
|
........................................................
|
|
..................................................
|
|
9. ........................................................
|
........................................................
|
|
..................................................
|
|
10. ........................................................
|
........................................................
|
|
..................................................
|
|
_______________________________________________________________________________________________________4. Total area available within the zone for EPZ Enterprise operations.__________________________________
|
|
(a) Land:
|
|
(b) Built-up area:
|
|
____________________________________________________________________________________________5. Total area contracted and occupied by licensed EPZ enterprises.___________________________________________________________________________________________
|
|
(a) Land:
|
|
(b) Built-up:
|
|
___________________________________________________________________________________________6. Total area contracted but un-occupied._________________________________________________________________________________________________
|
|
(a) Land:
|
|
(b) Built-up:
|
|
_______________________________________________________________________________________________________7. Total un-occupied area available for contracting:________________________________________________________________________________________________________
|
|
(a) Land:
|
|
(b) Built-up:
|
|
________________________________________________________________________________________________________8. Operating data cumulative for all EPZ enterprises operating in the zone_______________________________________________________________________________________________________
|
|
(a) Exports (Value)
|
Domestic Market
|
Foreign Markets
|
(b) Imports (Value)
|
|
(c) Employment (Nos)
|
Local
|
Expatriate
|
|
(a) Management
|
|
|
|
(b) Skilled
|
|
|
|
(c) Un-skilled
|
|
|
(d) Wages/Salaries
|
Local
|
Expatriate
|
|
(a) Management
|
|
|
|
(b) Skilled
|
|
|
|
(c) Un-skilled
|
|
|
(e) Rents (Value)
|
|
|
|
(a) Due during the Quarter:
|
|
|
|
(b) Average Rate per sq ft:
|
|
|
(f) Power (Value):
|
|
|
(g) Water (Value):
|
|
|
(h) Other Services Revenue (Value):
|
|
|
(i) Maintenance Cost (Value):
|
|
|
_______________________________________________________________________________________________________
|
DECLARATION
|
________________________________________________________________________________________________________
|
I hereby declare that to the best of my knowledge and belief all the particulars furnished in this report are true.
|
..........................................................................................
|
|
...................................................................
|
Date
|
|
Signature of Chief Executive
|
|
|
|
......................................................................
|
|
|
|
Name in Block Letters
|
____________________________________________________
FORM: EPZE(1)
THE EXPORT PROCESSING ZONE ACT
|
(Cap. 150)
|
APPLICATION FOR EXPORT PROCESSING ZONE ENTERPRISE LICENCE (MANUFACTURING)
|
Proposed products:
Tarrif Code:
_________________________________________________________________________________________________________A. PARTICULARS OF APPLICANT/COMPANY_________________________________________________________________________________________________________
|
1. (i) Name of applicant:
|
(ii) Address of applicant:
|
(iii) Telephone No.:
|
2. (i) Name of company which will undertake the manufacturing project:
|
(ii) Date of incorporation of company:
|
(iii) Name of registered office:
|
(iv) Telephone No.:
|
B. PARTICULARS OF DIRECTORS
Name
|
Identity Card No./ Passport No.
|
Nationality
|
Residential Address
|
.......
|
|
|
|
C. *PROJECT COST
If this project is to be implemented in phases, indicate investment cost and the timing for each phase.
|
|
Cost of Proposed Project (KSh.)
|
(i) Land (Specify area) .. .. ..
|
|
........................................................
|
(ii) Buildings (Specify covered area)
|
|
........................................................
|
iii) Equipment .. .. .. ..
|
|
........................................................
|
iv) Pre-occupational expenditure ..
|
|
........................................................
|
v) Working capital requirement ..
|
|
........................................................
|
|
|
|
TOTAL .. .. .. .. ..
|
|
___________________________
|
*(Where the land, buildings, plant and machinery are to be rented/leased, indicate the annual cost of rental/lease).
D. FINANCING
|
|
|
|
|
Proposed (KSh.)
|
1.
|
Authorized capital .. .. ..
|
|
...........................................
|
2.
|
Sources of fund:
|
|
..........................................
|
|
|
(i) Paid-up capital
|
|
|
|
|
|
Kenyan .. .. .. ..
|
|
..........................................
|
|
|
|
Foreign Nationals (Specify Country)
|
|
|
|
|
|
(a) .. .. .. ..
|
|
..........................................
|
|
|
|
(b) .. .. .. ..
|
|
..........................................
|
|
|
|
|
|
|
|
|
|
TOTAL
|
|
____________________
|
|
|
|
|
|
|
|
|
(ii) Loan
|
|
|
|
|
|
(a) Foreign .. .. ..
|
|
..........................................
|
|
|
|
(b) Domestic .. .. ..
|
|
..........................................
|
|
|
|
|
|
|
|
|
iii) Other sources of funds
|
|
|
|
|
|
(a) .. .. .. ..
|
|
..........................................
|
|
|
|
(b) .. .. .. ..
|
|
..........................................
|
|
|
|
|
|
|
|
|
|
TOTAL
|
|
____________________
|
E. MANUFACTURING PROCESS AND MACHINERY REQUIRED
1. Explain with the aid of a flow chart the proposed manufacturing process.
|
2. State the major items of machinery required for the proposed project*
|
Major Items of machinery
|
Condition (new or used)
|
Country of Origin
|
Estimated cost
|
........
|
|
|
|
* (State machinery exceeding 20 per cent of the total machinery cost).
F. PRODUCTION SCHEDULE
For each product, indicate the estimated annual production for the first 3 years. State the maximum attainable annual production capacity per 8-hour shift for each product.
Proposedproducts
|
PRODUCTION SCHEDULE
|
Maximum attainableannual productioncapacity per 8-hour
|
Year 1
|
Year 2
|
Year 3
|
|
Qty
|
Ex-factoryvalue(KSh.)
|
Qty
|
Ex-factoryvalue(KSh.)
|
Qty
|
Ex-factoryvalue(KSh.)
|
|
|
|
|
........
|
|
|
G. REQUIREMENT OF RAW MATERIALS/COMPONENTS
________________________________________________________________________________________________
Indicate the raw materials/components required for the proposed services for the first 12 months.
________________________________________________________________________________________________
Rawmaterials/components
|
Quantity
|
Value (KSh.)
|
Indicate whether locally available or imported
|
Raw Materials...Components...
|
|
|
|
In the case of companies which intend to commence production on an assembly basis, attach a programme of progressive local manufacture of component parts.
H. MARKET
Proposed products
|
% of finished products to be exported
|
Principal export destinations/principal consumers uses Principal export
|
|
Year 1
|
Year 2
|
Year
|
|
|
....
|
|
Proposed products
|
% of finished products for domestic market
|
Major uses/Principals Consumers
|
|
Year 1
|
Year 2
|
Year 3
|
|
....
|
|
|
I. PRODUCT PRICING
For each product to be manufactured the percentage cost of breakdown in terms of price for the following items:
Item
|
Products (Indicate % ofex factory price)
|
(i) Cost of imported raw materials/components(ii) Cost of local raw materials/components(iii) Cost of energy and fuel(iv) Cost of labour(v) Depreciation(vi) Interest payments, indirect taxes, land rates, etc.(vii) Administrative and marketing costs(viii) Cost of technology*(ix) Manufacturing Profit
|
|
TOTAL
|
100%
|
*(Includes royalty, management services and other related costs.)
J. LOCATION FACTORY
Indicate the proposed factory location:
|
K. EMPLOYMENT
Employment Category
|
Full-time employment
|
|
Kenyan
|
Foreign Nationals
|
1. Managerial staff2. Technical and supervisory staff3. Factory workers:(a) Skilled(b) Unskilled4. Sales, clerical and other workers
|
|
|
TOTAL
|
|
|
L. SOURCE OF TECHNICAL KNOW-HOW
Provide details including name and experience of the company providing technical know-how......
|
M. DECLARATION
I hereby declare that to the best of my knowledge and belief all the particulars furnished in this application are true.
|
..............................................
|
|
Signature of Applicant
|
|
..............................................
|
|
Name in Block Letters
|
|
..............................................
|
|
Designation in Company
|
|
|
Date ..............................................
|
|
____________________________________________________________________
FORM: EPZE(2)
THE EXPORT PROCESSING ZONE ACT
|
(Cap. 517)
|
APPLICATION FOR EXPORT PROCESSING ZONE ENTERPRISE LICENCE (COMMERCIAL)
|
Proposed activity:
_________________________________________________________________________________________________________A. PARTICULARS OF APPLICANT/COMPANY_________________________________________________________________________________________________________
|
1. (i) Name of applicant:
|
(ii) Address of applicant:
|
(iii) Telephone No.:
|
2. (i) Name of company which will undertake the manufacturing project:
|
(ii) Date of incorporation of company:
|
(iii) Name of registered office:
|
(iv) Telephone No.:
|
B. PARTICULARS OF DIRECTORS
Name
|
Identity Card No./ Passport No.
|
Nationality
|
Residential Address
|
.......
|
|
|
|
C. *PROJECT COST
If this project is to be implemented in phases, indicate investment cost and the timing for each phase.
|
|
Cost of Proposed Project (KSh.)
|
(i) Land (Specify area) .. .. ..
|
|
........................................................
|
(ii) Buildings (Specify covered area)
|
|
........................................................
|
iii) Plant and Machinery
|
|
........................................................
|
iv) Pre-occupational expenditure ..
|
|
........................................................
|
v) Working capital requirement ..
|
|
........................................................
|
|
|
|
TOTAL .. .. .. .. ..
|
|
___________________________
|
*(Where the land, buildings, plant and machinery are to be rented/leased, indicate the annual cost of rental/lease).
__________________________________________________________________________________________
D. FINANCING
_________________________________________________________________________________________
|
|
|
|
|
Proposed (KSh.)
|
1.
|
Authorized capital .. .. ..
|
|
...........................................
|
2.
|
Sources of fund:
|
|
..........................................
|
|
|
(i) Paid-up capital
|
|
|
|
|
|
Kenyan .. .. .. ..
|
|
..........................................
|
|
|
|
Foreign Nationals (Specify Country)
|
|
|
|
|
|
(a) .. .. .. ..
|
|
..........................................
|
|
|
|
(b) .. .. .. ..
|
|
..........................................
|
|
|
|
|
|
|
|
|
|
TOTAL
|
|
____________________
|
|
|
|
|
|
|
|
|
(ii) Loan
|
|
|
|
|
|
(a) Foreign .. .. ..
|
|
..........................................
|
|
|
|
(b) Domestic .. .. ..
|
|
..........................................
|
|
|
|
|
|
|
|
|
iii) Other sources of funds
|
|
|
|
|
|
(a) .. .. .. ..
|
|
..........................................
|
|
|
|
(b) .. .. .. ..
|
|
..........................................
|
|
|
|
|
|
|
|
|
|
TOTAL
|
|
____________________
|
E. MACHINERY AND EQUIPMENT REQUIRED
State the major items of machinery and equipment required for the proposed project.*
|
Major Items of Machinery and Equipment
|
Condition (New or Used)
|
Country of Origin
|
EstimatedCost
|
.....
|
|
|
|
*(State machinery and equipment exceeding 2 per cent of the total machinery cost).
.
.
.
F. LOCATION OF FACTORY
Indicate the proposed factory location:....
|
G. EMPLOYMENT
Employment Category
|
FULL-TIME EMPLOYMENT
|
Kenyan
|
Foreign Nationals
|
1. Managerial Staff2. Technical and Supervisory Staff3. Factory workers:(a) Skilled(b) Unskilled4 Sales, clerical and other workersTOTAL
|
|
|
H. SOURCE OF TECHNICAL KNOW-HOW
|
Provide details including name and experience of the company providing technical know-how.
|
.....
|
I. DECLARATION
|
.I hereby declare that to the best of my knowledge and belief all the particulars furnished in this application are true.....
|
|
..............................................
|
|
Signature of Applicant
|
|
..............................................
|
|
Name in Block Letters
|
|
..............................................
|
|
Designation in Company
|
|
|
Date ..............................................
|
|
____________________________________________________________________
FORM EPZE (1 & 2)
|
|
ANNEX 1
|
|
|
|
DETAILS ON MANPOWER REQUIREMENTS FOR THE PROJECT
|
_________________________________________________________________________________________________
_________________________________________________________________________________________________
A. Name and address of company which will undertake the service project.
Company
................................................................................................................
................................................................................................................
Address
................................................................................................................
................................................................................................................
B. Location of service premises
................................................................................................................
................................................................................................................
C. Main service to be provided
................................................................................................................
................................................................................................................
D. Year of commencement of operations
...............................................................................................................
E. Manpower Requirement
Occupations
|
Number Required in each year*
|
Occupational Classification Code
|
Year 1
|
Year 2
|
Year 3
|
Year 4
|
Year 5
|
(20 ...........)
|
(20 ...........)
|
(20 ...........)
|
(20 ...........)
|
(20 .......)
|
|
I. Engineering Discipline (Degree Graduates)
|
1. Electronics Engineers
|
|
|
|
|
|
|
2. Electrical Engineers
|
|
|
|
|
|
|
3. Mechanical Engineers
|
|
|
|
|
|
|
4. Civil Engineers
|
|
|
|
|
|
|
5. Electro-mechanical Engineers
|
|
|
|
|
|
|
6. Production Engineers
|
|
|
|
|
|
|
7. Industrial Efficiency Engineers
|
|
|
|
|
|
|
8. Instrumentation Engineers
|
|
|
|
|
|
|
9. Facilities Engineer
|
|
|
|
|
|
|
10. Materials Engineers
|
|
|
|
|
|
|
11. Software Engineers
|
|
|
|
|
|
|
12. Chemical Engineers
|
|
|
|
|
|
|
13. Petroleum Engineers
|
|
|
|
|
|
|
14. Metalurgical Engineers
|
|
|
|
|
|
|
.
|
.
.
.
15. Other Engineers (please specify
II. Science Graduates
Occupations
|
Number Required in each year*
|
Occupational Classification Code
|
Year 1(20 ....)
|
Year 2(20 ....)
|
Year 3(20 ....)
|
Year 4(20 ....)
|
Year 5(20 ....)
|
1. Chemists
|
|
|
|
|
|
|
2. Physicists
|
|
|
|
|
|
|
3. Micro-biologists
|
|
|
|
|
|
|
4. Others, please specify
III. Other Graduates
1. Lawyers
|
|
|
|
|
|
2. Accountants
|
|
|
|
|
|
3. Computer Personnel
(i) System Analysts
|
|
|
|
|
(ii) Computer Programmers
|
|
|
|
|
4. Management Executives
|
|
|
|
|
5. Others, please specify
IV.—Technicians (Generally Diploma/Certificate Graduates From Technical Colleges, Polytechnics or Equivalent Institutions)
Occupations
|
Number Required in each year*
|
Occupational Classification Code
|
Year 1
|
Year 2
|
Year 3
|
Year 4
|
Year 5
|
(20 .....)
|
(20 ......)
|
(20 ......)
|
(20 ......)
|
(20 ......)
|
|
1. Electronics Engineering
|
|
|
|
|
|
|
2. Electrical Engineering
|
|
|
|
|
|
|
3. Mechanical Engineering
|
|
|
|
|
|
|
4. Civil Engineering
|
|
|
|
|
|
|
5. Electro-mechanical Engineering
|
|
|
|
|
|
|
6. Production Engineering
|
|
|
|
|
|
|
7. Industrial Efficiency Engineering
|
|
|
|
|
|
|
8. Instrumentation Engineering
|
|
|
|
|
|
|
9. Facilities Engineering
|
|
|
|
|
|
|
10. Materials Engineering
|
|
|
|
|
|
|
11. Software Engineering
|
|
|
|
|
|
|
12. Chemical Engineering
|
|
|
|
|
|
|
13. Petroleum Engineering
|
|
|
|
|
|
|
14. Metalurgical Engineering
|
|
|
|
|
|
|
15. Computer Technician
|
|
|
|
|
|
|
16. Other (please specify)
V.—Craft Skills (Generally Graduates of Vocational/Industrial Training Institutes)
Occupations
|
Number Required in each year*
|
Occupational Classification Code
|
Year 1(20 ....)
|
Year 2(20 ....)
|
Year 3(20 ....)
|
Year 4(20 ....)
|
1. Plant Maintenance Mechanics
|
|
|
|
|
|
2. Electrician
|
|
|
|
|
|
3.Chargemen
|
|
|
|
|
|
4. Boilermen
|
|
|
|
|
|
5. Fitters
|
|
|
|
|
|
6. Welders
|
|
|
|
|
|
7. Arc Welders
|
|
|
|
|
|
8. Wiremen
|
|
|
|
|
|
9. Plumber
|
|
|
|
|
|
10. Tool and Die Makers
|
|
|
|
|
|
11. General Machinists
|
|
|
|
|
|
12. Precision Machinists
|
|
|
|
|
|
13. Turns
|
|
|
|
|
|
14. Others, please specify
IV. CAD-CAM Operators
|
|
|
|
|
|
VII. Semi-skilled Workers*
|
|
|
|
|
|
VIII. Unskilled Workers*
|
|
|
|
|
|
Notes.
* After Year 1, please state additional requirements for subsequent years.
|
+ Semi-skilled workers are workers involved in services who receive manly on the job-training for a period between 3 to 6 months e.g production operators.
|
+ Unskilled workers are workers performing manual task having simple routine work requiring physical eftort, e.g. cleaners, sweepers.
|
______________________________
FORM EPZE (1 & 2)
|
|
ANNEX 2
|
|
|
|
DETAILS ON ELECTRICITY REQUIREMENT FOR THE PROJECT
|
A. Name and Address of Company ..................................................
B. Main Products to be Manufactured..............................................
C. Location of factory ..........................................................
D. ..............................................................................
|
YEAR
|
1
|
2
|
3
|
4
|
Connected lighting load (KW)
|
|
|
|
|
Connected power load (HP)
|
|
|
|
|
Hours of operation
|
|
|
|
|
Normal demand (KW)
|
|
|
|
|
Maximum demand (KW)
|
|
|
|
|
Estimate daily consumption (unit)
|
|
|
|
|
E. What will be the size of the largest motor you intend to install?
.....................................................................................................................
Are there any electric furnaces, induction furnaces or electric welders to be installed? If so, give your requirements in kWA
..........................................................................................................................
What are the future growth prospects in addition to what you have stated?
..........................................................................................................................
.........................................................................................................................
Are there any special problems in addition to what you have stated?
..........................................................................................................................
..........................................................................................................................
_____________________________________
FORMS EPZE (1&2)
|
|
ANNEX 3
|
|
|
|
DETAILS ON WATER REQUIREMENT FOR THE PROJECT
|
A. Name and Address of Company ...............................................................
B. Main products to be manufactured ..........................................................
C. Location of Factory .......................................................................
D. ...........................................................................................
Estimate daily consumption of treated water (litre)
|
YEAR
|
1
|
2
|
3
|
4
|
|
|
|
|
E. If consumption is above 250,000 litres per day, please indicate whether demand is constant or intermittent over 24 hours or only 8 hours.
......................................................................................................................
_______________________________
FORM EPZE (1 and 2)
|
|
ANNEX 4
|
|
|
|
DETAILS ON TELECOMMUNICATION REQUIREMENT FOR THE PROJECT
|
A. Name and Address of Company .............................................................
B. Main Products to be Manufactured ........................................................
C. Location of Factory .....................................................................
D. Service required ........................................................................
|
|
Number
|
Date
|
Telephone:
|
Lines
|
|
|
Extensions
|
|
|
Mobile phones
|
|
|
Text services:
|
Telex
|
|
|
Telefax
|
|
|
Data services:
|
Leased Line
|
|
|
Telemail
|
|
|
E. Other Services required (please specify).
*Description of data services as in the Appendix.
_______________________________
FORM (1 and 2)
|
ANNEX 5
|
|
|
DETAILS ON PORT AND AIRPORT REQUIREMENTS FOR THE PROJECT
|
A. Name and Address of Company ............................................................
B. Main Products to be Manufactured .......................................................
C. Location of Factory ....................................................................
D. Port Facilities ........................................................................
What is the nature of the industry's imports and exports expected to be handled through the Port of Mombasa? ..........................................................................
What are the expected annual tonnage of imports and exports by sea?
|
Imports.
|
Exports.
|
(i) First 3 years .................................................................................................................................
|
(ii) 4th-5th year ............................................................................................................................
|
(iii) After 5th year .......................................................................................................................
|
By what types of vessels are the imports and exports carried to from the port?
(i) |
Regular general cargo liners. |
(ii) |
Special-purpose bulk carriers. |
By what means will the goods be conveyed between port and plant?
What is The average weight of each package or unit of the goods, both imports and exports?
..............................................................................
What is the average size of a consignment of imports and exports?
.............................................................................
If the goods are to be handed in bulk, please give details of the bulk handling operations and equipment to be used.
...............................................................................
What specialized facilities, i.e. other than those available for general cargo trade are expected to be provided by the Kenya Ports Authority?
..............................................................................
Does the industry need to rent storage warehouse in the Mombasa Port Area? If so please state area of space required.
.....................................................................................
Are the raw materials imported dangerous cargo, i.e. highly inflammable, poisonous or explosive?
.....................................................................................
E. Air Transport
What is the nature of the industry's imports and exports expected to be handled through the airport?
State the frequency of imports and exports per month and the volume/weight.
.....................................................................................
_____________________________________
FORM EPZE 1
|
ANNEX 6
|
|
|
PROCEDURE FOR SUBMITTING APPLICATIONS FOR EXPATRIATE POSTS
|
Companies intending to establish new manufacturing projects or service or to diversify or substantially increase their production capacities as a result of which, the services of expatriate personnel are required may submit applications for the required number of expatriate posts.
|
Companies applying for expatriate posts should complete the following forms—
|
1. Confidential Statement of Management Positions. (Forms EXP 1 and EXP).
|
2. Information on Expatriate Posts required
|
The above Forms to be completed in five copies should be returned to:
|
The Chief Executive
|
EPZA
|
(Address)
|
Instructions
|
In completing the application forms, the following points should be noted—
|
1. If a key post is required, it should be indicated with the letters (K.P.) beside the designation of the post in column 2 of the form on Confidential Statement of Management Positions.
|
2. Details on all employees earning Ksh. 10, 000 per month and above should be provided in the Confidential Statement of Management Position from irrespective of whether they are Kenyan citizens or not. Holders of Work Permits issued by the Immigration Department should also be reported in the form though they are classified under the lower management group.
|
3. All completely forms should be duly signed by a responsible officer representing the company.
|
INFORMATION ON EXPATRIATE POSTS REQUIRED
|
For each of the expatriate posts required, please elaborate as follows—
|
1. Designation of Post.
|
2. Basic Academic/Professional Qualifications Required.
|
3. Years of Experience/Experience Required.
|
4. Duration of Stay in Kenya Required.
|
5. Justification for Request.
|
6. Elaborate on proposed Training schemes for Kenyan Personnel to eventually assume the post.
|
7. Overall proposed Organization Structure of the Company indicating the positions of the Expatriate Posts in relation to other Posts to be filled by Kenyan.
|
|
|
|
..................................................
|
|
|
|
Signature of Applicant
|
|
|
|
..................................................
|
|
|
|
Name in Block Letters
|
|
|
|
..................................................
|
|
|
|
Designation in Company
|
Date: ......................................
|
|
|
|
|
|
|
|
|
|
_________________________________________________
Form: EPZE(3)
THE EXPORT PROCESSING ZONE ACT, 1990
|
(Cap. 150
|
APPLICATION FOR EXPORT PROCESSING ZONE ENTERPRISE LICENCE SERVICE
|
PROPOSEED SERVICE:
_________________________________________________________________________________________________________A. PARTICULARS OF APPLICANT/COMPANY_________________________________________________________________________________________________________
|
A. Particulars of Applicant/Company
|
1. (i) Name of applicant _______________________________________________
|
(ii) Address of applicant ______________________________________________
|
(iii) Telephone No. __________________________________________________
|
(iv) Name of Contact Person(s) _______________________________________
|
2. (i) Name of company which will undertake the service project _____________
|
(ii) Date of incorporation of company _______________________________
|
(iii) Name of registered office ______________________________________
|
(iv) Telephone No. _________________________________________________
|
B. Particulars of Directors
Name
|
Identity Card No./ Passport No.
|
Nationality
|
Residential Address
|
.......
|
|
|
|
C. Project Cost*
If this project is to be implemented in phases, indicate investment cost and the timing for each phase.
|
|
Cost of Proposed Project (KSh.)
|
(i) Land (Specify area) .. .. ..
|
|
........................................................
|
(ii) Buildings (Specify covered area)
|
|
........................................................
|
iii) Equipment
|
|
........................................................
|
iv) Pre-occupational expenditure ..
|
|
........................................................
|
v) Working capital requirement ..
|
|
........................................................
|
|
|
|
TOTAL .. .. .. .. ..
|
|
___________________________
|
*(Where the land, buildings, plant and machinery are to be rented/leased, indicate the annual cost of rental/lease).
D. Financing
|
|
|
|
|
Proposed (KSh.)
|
1.
|
Authorized capital .. .. ..
|
|
...........................................
|
2.
|
Sources of fund:
|
|
..........................................
|
|
|
(i) Paid-up capital
|
|
|
|
|
|
Kenyan .. .. .. ..
|
|
..........................................
|
|
|
|
Foreign Nationals (Specify Country)
|
|
|
|
|
|
(a) .. .. .. ..
|
|
..........................................
|
|
|
|
(b) .. .. .. ..
|
|
..........................................
|
|
|
|
|
|
|
|
|
|
TOTAL
|
|
____________________
|
|
|
|
|
|
|
|
|
(ii) Loan
|
|
|
|
|
|
(a) Foreign .. .. ..
|
|
..........................................
|
|
|
|
(b) Domestic .. .. ..
|
|
..........................................
|
|
|
|
|
|
|
|
|
iii) Other sources of funds
|
|
|
|
|
|
(a) .. .. .. ..
|
|
..........................................
|
|
|
|
(b) .. .. .. ..
|
|
..........................................
|
|
|
|
|
|
|
|
|
|
TOTAL
|
|
____________________
|
*Where loans are indicated please attach evidence of the availability of these funds
E. Service Flow Chart and Equipment Required
1. |
Explain with aid of a flow chart the proposed service activity (where applicable).
|
2. |
State the major items of equipment required for the proposed project*.
Major Items of Equipment
|
Condition (new or used)
|
Country of Origin
|
|
|
|
*(Only state machinery exceeding 10 per cent of the total machinery cost.)
F. Sales Schedule
For each service indicate the estimated annual sales for the first 3 years.
Proposed Service
|
Sales Schedule
|
Year 1
|
Year 2
|
Year 3
|
|
Value (KSh.)
|
Value (KSh.)
|
Value (KSh.)
|
|
|
|
G. Requirement of Raw Materials/Components
Indicate the raw materials/components required for the proposed services for the first 12 months if applicable.
Rawmaterials/components
|
Quantity
|
Value (KSh.)
|
Indicate whether locally available or imported
|
(List these below)
|
|
|
|
H. Market
Proposed services (List these below)
|
Percentage of services to be exported
|
Principal export destinations/principal consumers uses
|
|
Year 1
|
Year 2
|
Year
|
|
|
...
|
|
Proposed services (List these below)
|
Percentage of services to be sold locally
|
Major uses/Principals Consumers
|
|
Year 1
|
Year 2
|
Year 3
|
|
|
|
|
I. Pricing
For each service activity provide the percentage cost of breakdown in terms of price for the following items:
Item
|
Service (Indicate percentage of selling price)
|
(i) Cost of imported raw materials/components(ii) Cost of local raw materials/components(iii) Cost of energy and fuel(iv) Cost of labour(v) Depreciation(vi) Interest payments, indirect taxes, land rates, etc.(vii) Administrative and marketing costs(viii) Cost of technology*(ix) Profit
|
|
TOTAL
|
100%
|
*(Includes royality, management services and other related costs.)
J. Location of Premises
Indicate the proposed location for the service activity.
K. Employment
Employment Category
|
Full-time employment
|
|
Kenyan
|
Foreign Nationals
|
1. Managerial staff2. Technical and supervisory staff3. Factory workers:(a) Skilled(b) Unskilled4. Sales, clerical and other workers
|
|
|
TOTAL
|
|
|
L. Source of Technical Know-how
Provide details including name and experience of the company providing technical know-how.
M. Declaration
I hereby declare that to the best of my knowledge and belief all the particulars furnished in this application are true.
|
..............................................
|
|
Signature of Applicant
|
|
..............................................
|
|
Name in Block Letters
|
|
..............................................
|
|
Designation in Company
|
|
|
|
Date ..............................................
|
|
____________________________________________________________________
FORM EPZE (3)
|
|
ANNEX 1
|
|
|
|
DETAILS ON MANPOWER REQUIREMENTS FOR THE PROJECT
|
_________________________________________________________________________________________________
_________________________________________________________________________________________________
A. Name and address of company which will undertake the service project.
Company
................................................................................................................
................................................................................................................
Address
................................................................................................................
................................................................................................................
B. Location of service premises
................................................................................................................
................................................................................................................
C. Main service to be provided
................................................................................................................
................................................................................................................
D. Year of commencement of operations
...............................................................................................................
E. Manpower Requirement
Occupations
|
Number Required in each year*
|
Occupational Classification Code
|
Year 1
|
Year 2
|
Year 3
|
Year 4
|
(20 ...........)
|
(20 ...........)
|
(20 ...........)
|
(20 .......)
|
|
I. Engineering Discipline (Degree Graduates)
1. Electronics Engineers
|
|
|
|
|
|
2. Electrical Engineers
|
|
|
|
|
|
3. Mechanical Engineers
|
|
|
|
|
|
4. Civil Engineers
|
|
|
|
|
|
5. Electro-mechanical Engineers
|
|
|
|
|
|
6. Production Engineers
|
|
|
|
|
|
7. Industrial Efficiency Engineers
|
|
|
|
|
|
8. Instrumentation Engineers
|
|
|
|
|
|
9. Facilities Engineer
|
|
|
|
|
|
10. Materials Engineers
|
|
|
|
|
|
11. Software Engineers
|
|
|
|
|
|
12. Chemical Engineers
|
|
|
|
|
|
13. Petroleum Engineers
|
|
|
|
|
|
14. Metalurgical Engineers
|
|
|
|
|
|
15. Other Engineers (please specify
II. Science Graduates
Occupations
|
Number Required in each year*
|
Occupational Classification Code
|
Year 1(20 ....)
|
Year 2(20 ....)
|
Year 3(20 ....)
|
Year 5(20 ....)
|
1. Chemists
|
|
|
|
|
|
2. Physicists
|
|
|
|
|
|
3. Micro-biologists
|
|
|
|
|
|
4. Others, please specify
III. Other Graduates
1. Lawyers
|
|
|
|
|
|
2. Accountants
|
|
|
|
|
|
3. Computer Personnel
(i) System Analysts
|
|
|
|
|
(ii) Computer Programmers . .
|
|
|
|
|
4. Management Executives . .
|
|
|
|
|
5. Others, please specify
IV.—Technicians (Generally Diploma/Certificate Graduates From Technical Colleges, Polytechnics or Equivalent Institutions)
Occupations
|
Number Required in each year*
|
Occupational Classification Code
|
Year 1
|
Year 2
|
|
Year 4
|
(20 .....)
|
(20 ......)
|
|
(20 ......)
|
|
1. Electronics Engineers
|
|
|
|
|
|
2. Electrical Engineers
|
|
|
|
|
|
3. Mechanical Engineers
|
|
|
|
|
|
4. Civil Engineers
|
|
|
|
|
|
5. Electro-mechanical Engineers
|
|
|
|
|
|
6. Production Engineers
|
|
|
|
|
|
7. Industrial Efficiency Engineers
|
|
|
|
|
|
8. Instrumentation Engineers
|
|
|
|
|
|
9. Facilities Engineer
|
|
|
|
|
|
10. Materials Engineers
|
|
|
|
|
|
11. Software Engineers
|
|
|
|
|
|
12. Chemical Engineers
|
|
|
|
|
|
13. Petroleum Engineers
|
|
|
|
|
|
14. Metalurgical Engineers
|
|
|
|
|
|
15. Computer Technician
|
|
|
|
|
|
16. Other (please specify)
V.—Craft Skills (Generally Graduates of Vocational/Industrial Training Institutes)
Occupations
|
Number Required in each year*
|
Occupational Classification Code
|
Year 1(20 ....)
|
Year 2(20 ....)
|
Year3(20 ....)
|
Year 4(20 ....)
|
1. Plant Maintenance Mechanics
|
|
|
|
|
|
2. Electrician
|
|
|
|
|
|
3.Chargemen
|
|
|
|
|
|
4. Boilermen
|
|
|
|
|
|
5. Fitters
|
|
|
|
|
|
6. Welders
|
|
|
|
|
|
7. Arc Welders
|
|
|
|
|
|
8. Wiremen
|
|
|
|
|
|
9. Plumber
|
|
|
|
|
|
10. Tool and Die Makers
|
|
|
|
|
|
11. General Machinists
|
|
|
|
|
|
12. Precision Machinists
|
|
|
|
|
|
13. Turns
|
|
|
|
|
|
14. Others, please specify
VI. CAD-CAM Operators
|
|
|
|
|
|
VII. Semi-skilled Workers*
|
|
|
|
|
|
VIII. Unskilled Workers*
|
|
|
|
|
|
Notes.
Semi-skilled workers are workers involved in services who receive manly on the job-training for a period between 3 to 6 months e.g production operators.
|
Unskilled workers are workers performing manual task having simple routine work requiring physical eftort, e.g. cleaners, sweepers.
|
______________________________
FORM EPZE (3)
|
|
ANNEX 2
|
|
|
|
DETAILS ON ELECTRICITY REQUIREMENT FOR THE PROJECT
|
(a) |
Name and Address of Company ...........................................
|
(b) |
Main services to be provided.......................................
|
(c) |
Location of premises ...................................................
|
(d) |
.......................................................................
|
|
YEAR
|
|
|
|
1
|
2
|
3
|
4
|
Connected lighting load (kW)
|
|
|
|
|
Connected power load (HP)
|
|
|
|
|
Hours of operation
|
|
|
|
|
Normal demand (kW)
|
|
|
|
|
Maximum demand (KW)
|
|
|
|
|
Estimate daily consumption (unit)
|
|
|
|
|
(e) |
What will be the size of the largest motor you intend to install?
|
.........................................................................................
Are there any electric furnaces, induction furnaces or electric welders to be installed? If so, give your requirements in kWA
...........................................................................................
What are the future growth prospects in addition to what you have stated?
.................................................................................
...................................................................................
Are there any special problems in addition to what you have stated?
......................................................................................
......................................................................................
_____________________________________
FORMS EPZE (3)
|
|
ANNEX 3
|
|
|
|
DETAILS ON WATER REQUIREMENT FOR THE PROJECT
|
(a) Name and Address of Company ..................................................
(b) Main services to be provided .................................................
(c) Location of premises ..........................................................
(d) ..............................................................................
Estimate daily consumption of treated water (litre)
|
YEAR
|
1
|
2
|
3
|
4
|
|
|
|
|
(e). If consumption is above 250,000 litres per day, please indicate whether demand is constant or intermittent over 24 hours or only 8 hours.
......................................................................................................................
_______________________________
FORM EPZE (3)
|
|
ANNEX 4
|
|
|
|
DETAILS ON TELECOMMUNICATION REQUIREMENT FOR THE PROJECT
|
(a) Name and Address of Company .............................................................
(b) Main service to be provided ........................................................
(c) Location of premises .....................................................................
(d) Service required ........................................................................
|
|
Number
|
Date
|
Telephone:
|
Lines
|
|
|
Extensions
|
|
|
Mobile phones
|
|
|
Text services
|
Telex
|
|
|
Telefax
|
|
|
Data services
|
Leased Line
|
|
|
Telemail
|
|
|
(e) Other Services required (please specify)
*Description of data services as in the Appendix.
_______________________________
FORM EPZE (3)
|
ANNEX 5
|
|
|
DETAILS ON PORT AND AIRPORT REQUIREMENTS FOR THE PROJECT
|
(a) Name and Address of Company ............................................................
(b) Main services to be provided .......................................................
(c) Location of premises ....................................................................
(d) Port Facilities ........................................................................
What is the nature of the industry's imports and exports expected to be handled through the Port of Mombasa? ..........................................................................
What are the expected annual tonnage of imports and exports by sea?
|
Imports.
|
Exports.
|
(i) First 3 years ......................................................
|
(ii) 4th-5th year ......................................................
|
(iii) After 5th year ...................................................
|
By what types of vessels are the imports and exports carried to from the port?
(i) |
Regular general cargo liners. |
(ii) |
Special-purpose bulk carriers. |
By what means will the goods be conveyed between port and plant?
What is The average weight of each package or unit of the goods, both imports and exports?
..............................................................................
What is the average size of a consignment of imports and exports?
.............................................................................
If the goods are to be handed in bulk, please give details of the bulk handling operations and equipment to be used.
...............................................................................
What specialized facilities, i.e. other than those available for general cargo trade are expected to be provided by the Kenya Ports Authority?
..............................................................................
Does the industry need to rent storage warehouse in the Mombasa Port Area? If so please state area of space required.
.....................................................................................
Are the raw materials imported dangerous cargo, i.e. highly inflammable, poisonous or explosive?
.....................................................................................
What is the nature of the industry's imports and exports expected to be handled through the airport? State the frequency of imports and exports per month and the volume/weight.
.....................................................................................
.....................................................................................
(c) |
(i) |
by inserting "& 3" in the title of the form appearing in annex 6 of the First Schedule so that it reads "EPZE (1 & 3)". |
(ii) |
by inserting the words "services or" between the words "or" and "to" in the line 1 |
|
_______________________________________
__________________________________
I hereby declare to the best of my knowledge that :
(i) |
No application has been made on similar requirement of expatriate position to the Immigration Department or eslewhere. |
(ii) |
The expatriates presently employed in the company are as follows:- |
Name
|
Designation
|
Name Period Approved(in years)
|
......
|
|
|
|
|
Signature ....................................
|
|
|
Name ........................................
|
|
|
Designation ..............................
|
_________________________
EXPORT PROCESSING ZONE AUTHORITY
|
ANNUAL SURVEY OF EPZE
|
FOR YEAR ENDED JUNE
|
ALL INFORMATION WILL BE TREATED WITH THE STRICTEST CONFIDENCE
|
To be completed and returned to(Address of EPZA)by Sept. following end of the year
|
SECTION 1: GENERAL
1. Name of Reporting Enterprise: _____________________________________________________________
|
. Address: ________________________________________________________________________________
|
3. Telephone: _______________ 4. Telex No. __________________ 5. Fax No. ________________________
|
6. Products Manufactured: ______________________________________________________________________________________________________________________________________________________________________________________________________________________________
|
Date of Operation: ________________________________________________________________
|
SECTION II: FINANCIAL INFORMATION AND EQUITY STRUCTURE
|
1. Authorized Capital: ___________________________________________________________
|
2. Paid-Up Capital: ______________________________________________________________
|
3. Total Capital Investment: ______________________________________________________
|
4. Proposed Capital Investment
|
for forthcoming year: ___________________________________________________________
|
5. Total Fixed Assets: ___________________________________________________________
|
6. Equity Structure
|
Local: _____________________________________%
|
Foreign (Specify)
|
|
|
US ________________________________________%
|
U.K. ______________________________________%
|
Japan _____________________________________%
|
India ______________________________________%
|
|
|
|
|
|
SECTION III: EMPLOYMENT AND WAGES
Category of Employment No.
|
Local
|
Expatriate
|
Total
|
|
|
|
No.
|
TotalWages
|
No.
|
TotalWages
|
No.
|
TotalWages
|
|
Managerial and ProfessionalSupervisory and TechnicalClericalGeneral WorkersSkilledUnskilled
|
|
|
|
|
|
|
TOTAL
|
|
|
|
|
|
|
SECTION IV:
TABLE A: IMPORT/PURCHASES OF RAW MATERIALS*
Type of rawmaterials
|
IMPORTS/PURCHASES DURING THE YEAR (KSHS.)
|
Value of Imports/Purchase
|
Overseas
|
Local
|
Importedto(specify country)
|
Value
|
Value of purchases from EPZ/MUB
|
Value ofpurchasesfrom principalCustoms Area
|
......
|
|
|
|
|
|
TOTAL
|
|
|
|
|
|
Note:* Raw Materials-include all materials, components that enter into the production process.
TABLE B: IMPORT/PURCHASES OF CAPITAL GOODS*
Type of rawmaterials
|
IMPORTS/PURCHASESDURING THE YEAR (KSH.)
|
Value ofTotal Re-exports/sales
|
|
Overseas
|
Local
|
|
Exported to (specify country)
|
Value
|
Value of purchases from EPZ/MUB
|
Value ofpurchasesfromprincipalCustomsArea
|
....
|
|
|
|
|
|
TOTAL
|
|
|
|
|
|
SECTION V:
TABLE C: RE-EXPORT/SALES OF RAW MATERIALS*
Type ofrawmaterials
|
RE-EXPORTS/SALES DURING THE YEAR (KSH.)
|
|
Overseas
|
Local
|
Value of Total Re-exports/sales
|
|
Exported to (specify country)
|
Value
|
Value of purchases from EPZ/MUB
|
Value ofsalesfromprincipalCustomsArea
|
......
|
|
|
|
|
|
TOTAL
|
|
|
|
|
|
Note:* Raw Materials-include all materials, components that enter into the production process.
SECTION V:
TABLE D: RE-EXPORTS/SALES OF RAW MATERIALS*
Type ofrawmaterials
|
RE-EXPORTS/ SALES DURING THE YEAR (KSH.)
|
|
Overseas
|
Local
|
Value of Re-exports sales
|
|
Exported to (specify country)
|
Value
|
Value of purchases from EPZ/MUB
|
Value ofsalesfromprincipalCustomsArea
|
......
|
|
|
|
|
|
TOTAL
|
|
|
|
|
|
Note: *Capital Goods—include all physical assets which are expected to have a productive life of more than one year, excluding land and buildings.
TABLE E: EXPORTS/SALES OF FINISHED GOODS*
Type of FinishedGoods
|
EXPORTS/SALES OF FINISHED GOODS*
|
Value ofTotal Re-exports/Sales
|
Overseas
|
Local
|
Exported to (specify country)
|
Value
|
Valueof purchases from EPZ/MUB
|
Value ofpurchasesfromprincipalCustomsArea
|
......
|
|
|
|
|
|
TOTAL
|
|
|
|
|
|
Note: Finished Goods—include by-products
TABLE F: EXPORTS/SALES OF REJECTS, SCRAP AND WASTE*
Type of Reject, Scrap and Waste
|
EXPORTS/SALES DURING THE YEAR (KSH.)
|
Value of Re-exports/sales
|
Overseas
|
Local
|
Exported to (specify country)
|
Value
|
Value of Sales to Principal Customs Area
|
Value ofpurchasesfromprincipalCustomsArea
|
....TOTAL
|
|
|
|
|
|
SECTION VI: (CARGO STATISTICS
State the mode of transport utilized for all your exports overseas and imports from overseas:
|
|
Value of Cargo
|
Value of Cargo (Kshs.)
|
|
|
(a) Exports
|
|
|
(i) By air (in kilos) .. .. .. . .
|
|
|
(ii)By sea (in metric tons) .. .. . .
|
|
|
(iii)By road/rail (in metric tons) .. .. ..
|
|
|
By road/rail (in cu. metres, for containers) ..
|
|
|
TOTAL .. .. .. .. .. ..
|
|
|
(b) Imports
|
|
|
(i)By air (in kilos) .. .. .. .. . .
|
|
|
(ii)By sea (in metric tons).. .. .. . .
|
|
|
(iii)By road/rail (in metric tons) .. .. ..By road/rail (in cu. metres, for containers) ..
|
|
|
TOTAL .. .. .. .. ..
|
|
|
SECTION VII: WORKING HOURS AND TRANSPORT FACILITIES PROVIDED FOR EMPLOYEES
|
|
|
|
Number of Buses provided
|
Type
|
Type
|
Type
|
1. (A) Working hours for office staff:
|
|
|
|
From ____________ To _________
|
|
|
|
(B) Working hours for production workers:
|
|
|
|
(i) 1st shift
|
|
|
|
From ____________ To _________
|
|
|
|
(ii) 2nd shift
|
|
|
|
From ____________ To _________
|
|
|
|
(iii) 3rd shift
|
|
|
|
From ____________ To _________
|
|
|
|
TOTAL NUMBER OF BUSES
|
|
|
|
2. If the buses are not owned by you, state the name of the person/company providing the service and the amounts paid in respect of these services for the whole year.
Name of Person/Company
|
|
Amount Paid forthe Year (KSh.)
|
______________________________________________________________________________
|
______________________________________________________________________________
|
______________________________________________________________________________
|
3. If the buses are owned by you, state the total cost* of providing transport facilities for your employees, for the whole year:
KSh. _______________________
Note:* Total Cost—include all expenditure of a non-capital nature e.g. cost of fuel, road tax, insurance, repairs and maintenance, drivers' salaries, depreciation, etc.
|
I declare that the information contained in this questionnaire is complete and correct to the best of my knowledge and belief.
|
Signature: __________________________ Official Position: __________________________
|
Name: ______________________________ Tel: __________________________________
|
Date: ________________________________________
|
|
|
|
_______________________________
FORM EPZ PASS (1)
|
|
|
|
THE EXPORT PROCESSING ZONE ACT
|
Cap. 517
|
APPLICATION FOR SECURITY PASS (VISITORS) EPZ ..............................................
|
Name of Applicant:______________________________________________________________
I/C./Passport No:______________________________________________________________
Company:_______________________________________________________________________
Address:________________________________________________________________________
Purpose:________________________________________________________________________
Signature.______________________________________________________________________
EPZ Checkpoint: ................................... EPZ Pass No..........................
Export Processing Zone .............(Valid until ........................).Name: ..................................I.C./Passport No. .....................Company: ...........................Address: ................................Signature: ............................Pass No. .............................
|
Photograph....
|
Company Logo...
|
Sample of EPZ Pass (for employees/regular visitors):
Proposed size of pass: 90 mm. X 60 mm.
Sample of EPZ pass (for day visitors):
Export Processing Zone ...........................(Temporary Visitors Pass)EPZ Pass No.:
|
EPZ.Logo
|
_________________________
FORM EPD (1)
ORIGINAL
EXPORT PROCESSING ZONE LICENCE
|
Serial No.:
|
|
Licence No.
|
IN PURSUANCE OF THE EXPORT PROCESSING ZONE ACT, 1990
|
(Cap. 517)
|
I hereby license .............................................................................................................
|
Name of the Zone
|
owned/leased by : ...........................................................................................................
|
Name of Applicant
|
of ...........................................................................................................................................
|
Registered Office Address
|
to act as Licensed Export Processing Zone as from: ...................................................
|
|
|
Date
|
at ..........................................................................................................................
|
L.R. No. and Location of Zone
|
subject to conditions attached herewith :
|
Dated ............................................................, 20 .......
|
.............................................Chairperson
|
|
|
_________________________
|
|
|
|
|
|
|
|
|
EXPORT PROCESSING ZONE DEVELOPER OPERATOR LICENCE
|
Serial No.:
|
|
Licence No.
|
IN PURSUANCE OF THE EXPORT PROCESSING ZONE ACT, 1990
|
(Cap. 517)
|
I hereby License .............................................................................................................
|
Applicant's Name
|
owned/leased by : ......................................................................................................
|
Name of Applicant
|
of ...................................................................................................................................
|
Registered Address
|
to act as Licensed Export Processing Zone Developer Operator as from : ........................
|
................................................................................................................................................................
|
Date
|
at .......................................................................................................................................................
|
Name of Zone
|
subject to conditions attached herewith :
|
Dated ............................................................, 20 .......
|
_________________________
EXPORT PROCESSING ZONE ENTERPRISE LICENCE
|
Serial No.:
|
|
Licence No.
|
IN PURSUANCE OF THE EXPORT PROCESSING ZONE ACT, 1990
|
(Cap. 517)
|
I hereby designate ..............................................................................................................
|
Applicant's Name
|
of ..............................................................................................................................................
|
Registered Address
|
to act as Licensed Export Processing Zone Enterprise as of ...........................................
|
|
at ...................................................................................... .................................................
|
|
|
|
............................................................................................................................................
|
Date
|
at ...................................................................................................................................
|
Place of Manufacturing
|
for product(s) specified hereunder subject to conditions attached herewith :Product (5) :
|
Dated ............................................................, 20 .......
|
|
THE EXPORT PROCESSING ZONES (FEES) REGULATIONS, 1994
1. |
These Regulations may be cited as the Export Processing Zones (Fees) Regulations, 1994, and shall come into operation on 1st January, 1995.
|
2. |
Export Processing Zones enterprises shall pay the following licensing fees—
Application fees (non-refundable).................................................................. US $ 250
Annual licence fees............................................................................... US $ 1,000
|
3. |
Export Processing Zone developers and operators shall pay the following fees—
Application fees (non-refundable).................................................................. US $ 250
Annual licence fees............................................................................... US $ 5,000
|
THE EXPORT PROCESSING ZONES (FEES) REGULATIONS
1. |
These Regulations may be cited as the Export Processing Zones (Fees) Regulations, 1994, and shall come into operation on 1st January, 1995.
|
2. |
Export Processing Zones enterprises shall pay the following licensing fees—
Application fees (non-refundable).................................................................. US $ 250
Annual licence fees............................................................................... US $ 1,000
|
3. |
Export Processing Zone developers and operators shall pay the following fees—
Application fees (non-refundable).................................................................. US $ 250
Annual licence fees............................................................................... US $ 5,000
|
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15 of the Export Processing Zones Act, the Minister for Tourism, Trade and Industry declares the land specified in the Schedule hereto to be an export processing zone.
SCHEDULE
All that piece of land being L.R. No. 18474 measuring approximately 454.4 hectares in Mavoko Township, Machakos District.
THE EXPORT PROCESSING ZONES (BUSINESS SERVICES) REGULATIONS
ARRANGEMENT OF REGULATIONS
4. |
Application for permit
|
9. |
Notification of change of particulars
|
10. |
EPZ Business Permit fees
|
12. |
Failure to use permit
|
13. |
Cancellation of permit
|
14. |
Permit not transferable
|
SCHEDULES
FIRST SCHEDULE [r. 3 (a)] — |
ELIGIBLE BUSINESS SERVICES
|
SECOND SCHEDULE [r. 6] — |
APPLICATION FOR AN EXPORT PROCESSING ZONES BUSINESS SERVICE PERMIT
|
THIRD SCHEDULE [r. 8] — |
EXPORT PROCESSING ZONE BUSINESS SERVICE PERMIT
|
FOURTH SCHEDULE [r. 10] — |
EPZ BUSINESS SERVICES FEES
|
THE EXPORT PROCESSING ZONES (BUSINESS SERVICES) REGULATIONS, 2004
1. |
Citation
These Regulations may be cited as the Export Processing Zones (Business Services) Regulations, 2004.
|
2. |
Interpretation
In these Regulations unless the context otherwise requires—
“business service permit” means an export processing zone business service permit issued pursuant to these Regulations;
“export processing zone business service” means a trade or business conducted by any individual, partnership, corporation or other entity conducting a trade or business within Kenya which is not an export processing zone enterprise.
|
3. |
Application procedure
Any person may apply for an export processing zone business service permit if the proposed business service—
(a) |
is set out in the First Schedule hereto as an eligible business service; and
|
(b) |
is carried out within an export processing zone.
|
|
4. |
Application for permit
An application for a permit to be issued under these Regulations shall contain the following information—
(a) |
the applicant’s particulars;
|
(b) |
the intended activity, which should be an eligible business service as set out in the First Schedule;
|
(c) |
evidence of prior business experience in the field within which the intended activity falls;
|
(d) |
the desired location of the proposed business service;
|
(f) |
details of ownership of the proposed business;
|
(g) |
details of jobs to be created; and
|
(h) |
the name and professional qualifications of the person who will be in charge of the day-to-day operations of the business.
|
|
5. |
Business plan
In addition to the particulars mentioned in regulation 4, the applicant shall submit to the Authority—
(a) |
(i) |
amounts of money to be invested in the said business; |
(ii) |
the expected sales turnover; |
(iii) |
operating expenses; and |
(iv) |
cash flow projections of the proposed business service; |
|
(b) |
certified copies of relevant professional, occupational or business licences where applicable.
|
|
6. |
Application form
An application for a business service permit shall be in the prescribed form set out in the Second Schedule to these Regulations.
|
7. |
Decision of Authority
The Authority shall evaluate the application for a business service permit and render its decision within thirty days from the date on which the completed application form and all the relevant additional information are received by the Authority.
|
8. |
Business Permit
A business service permit shall be in Form EPZ/BP set out in the Third Schedule to these Regulations.
|
9. |
Notification of change of particulars
(a) |
the holder of a business service permit ceases to carry on business to which it relates; or
|
(b) |
a change occurs in any particulars of the proposed business service, including ownership of the business, location, name or style under which the business is carried on, the holder of the permit shall within fourteen days notify the Authority accordingly and furnish it with particulars of the change.
|
|
10. |
EPZ Business Permit fees
The Authority shall levy a Business Service Permit fee as set out in the Fourth Schedule to these Regulations.
|
11. |
Validity of permit
A permit issued under these regulations shall be valid for a period of one calendar year and shall be renewed for a like period upon payment of the prescribed fee.
|
12. |
Failure to use permit
Where the holder of a permit is unable to use the permit within three months from the date of issue thereof, the holder shall forthwith notify the Authority of the failure, giving reasons therefor, and the Authority shall, where satisfied with the reasons given, specify the period within which the holder shall comply with the terms of the permit.
|
13. |
Cancellation of permit
Where a period of three months from the date of issue of a permit has expired without the holder thereof performing the activities in accordance with the terms of the permit and no notification has been made in accordance with these Regulations, the permit shall lapse and shall be cancelled by the Authority.
|
14. |
Permit not transferable
A permit issued under these Regulations shall not be transferable to a third party.
|
FIRST SCHEDULE
ELIGIBLE BUSINESS SERVICES
4. |
Staff Recruitment and payroll services.
|
5. |
Postal and telecommunication bureau.
|
7. |
Courier and document handling.
|
8. |
Transportation services (freight and passenger).
|
9. |
Installation, repair and maintenance.
|
10. |
Fitness club, sports club and gymnasium.
|
11. |
Medical and related services.
|
12. |
Laboratory, testing and quality certification services.
|
14. |
Business cosultancy services (e.g. marketing, training, legal).
|
16. |
Foreign trade missions (commercial trade offices).
|
17. |
International Disaster Relief Agencies.
|
18. |
International Non-Governmental Organizations.
|
THE EXPORT PROCESSING ZONES (BUSINESS SERVICES) REGULATIONS, 2004
1. |
Citation
These Regulations may be cited as the Export Processing Zones (Business Services) Regulations, 2004.
|
2. |
Interpretation
In these Regulations unless the context otherwise requires—
“business service permit” means an export processing zone business service permit issued pursuant to these Regulations;
“export processing zone business service” means a trade or business conducted by any individual, partnership, corporation or other entity conducting a trade or business within Kenya which is not an export processing zone enterprise.
|
3. |
Application procedure
Any person may apply for an export processing zone business service permit if the proposed business service—
(a) |
is set out in the First Schedule hereto as an eligible business service; and
|
(b) |
is carried out within an export processing zone.
|
|
4. |
Application for permit
An application for a permit to be issued under these Regulations shall contain the following information—
(a) |
the applicant’s particulars;
|
(b) |
the intended activity, which should be an eligible business service as set out in the First Schedule;
|
(c) |
evidence of prior business experience in the field within which the intended activity falls;
|
(d) |
the desired location of the proposed business service;
|
(f) |
details of ownership of the proposed business;
|
(g) |
details of jobs to be created; and
|
(h) |
the name and professional qualifications of the person who will be in charge of the day-to-day operations of the business.
|
|
5. |
Business plan
In addition to the particulars mentioned in regulation 4, the applicant shall submit to the Authority—
(a) |
(i) |
amounts of money to be invested in the said business; |
(ii) |
the expected sales turnover; |
(iii) |
operating expenses; and |
(iv) |
cash flow projections of the proposed business service; |
|
(b) |
certified copies of relevant professional, occupational or business licences where applicable.
|
|
6. |
Application form
An application for a business service permit shall be in the prescribed form set out in the Second Schedule to these Regulations.
|
7. |
Decision of Authority
The Authority shall evaluate the application for a business service permit and render its decision within thirty days from the date on which the completed application form and all the relevant additional information are received by the Authority.
|
8. |
Business Permit
A business service permit shall be in Form EPZ/BP set out in the Third Schedule to these Regulations.
|
9. |
Notification of change of particulars
(a) |
the holder of a business service permit ceases to carry on business to which it relates; or
|
(b) |
a change occurs in any particulars of the proposed business service, including ownership of the business, location, name or style under which the business is carried on, the holder of the permit shall within fourteen days notify the Authority accordingly and furnish it with particulars of the change.
|
|
10. |
EPZ Business Permit fees
The Authority shall levy a Business Service Permit fee as set out in the Fourth Schedule to these Regulations.
|
11. |
Validity of permit
A permit issued under these regulations shall be valid for a period of one calendar year and shall be renewed for a like period upon payment of the prescribed fee.
|
12. |
Failure to use permit
Where the holder of a permit is unable to use the permit within three months from the date of issue thereof, the holder shall forthwith notify the Authority of the failure, giving reasons therefor, and the Authority shall, where satisfied with the reasons given, specify the period within which the holder shall comply with the terms of the permit.
|
13. |
Cancellation of permit
Where a period of three months from the date of issue of a permit has expired without the holder thereof performing the activities in accordance with the terms of the permit and no notification has been made in accordance with these Regulations, the permit shall lapse and shall be cancelled by the Authority.
|
14. |
Permit not transferable
A permit issued under these Regulations shall not be transferable to a third party.
|
FIRST SCHEDULE
[Regulation 3 (a), L.N. 13/2010, r. 2.]
ELIGIBLE BUSINESS SERVICES
PART A - All export processing zones
5. |
Postal and telecommunication bureau.
|
7. |
Courier and document handling.
|
8. |
Transportation services (freight and passenger).
|
9. |
Installation, repair and maintenance.
|
10. |
Fitness club, sports club and gymnasium.
|
11. |
Medical and related services.
|
12. |
Laboratory testing and quality certification services.
|
14. |
Business consultancy services (e.g. marketing, training, legal).
|
16. |
Other financial services.
|
17. |
Power generation and distribution services.
|
18. |
Water and sewerage services.
|
19. |
Telecommunication and telecommunication infrastructure services.
|
20. |
Internet services provision.
|
22. |
Grounds maintenance and landscaping.
|
23. |
Cleaning, pest control and sanitation.
|
24. |
Foreign trade missions (commercial trade offices).
|
25. |
International Disaster Relief Agencies.
|
26. |
International Non-Governmental Organizations.
|
PART B - Athi River Export Processing Zone Commercial Area (L.R. No. 18474/14)
1. |
Motor vehicle fuelling and maintenance services.
|
2. |
Retail Shops including produce market, dry cleaner, grocery shop, super market (selling non-EPZ goods).
|
4. |
Cinema, theatre, casino and other entertainment services.
|
5. |
Real estate agent, property developer and property manager.
|
6. |
Meetings, conventions and exhibitions.
|
7. |
Repair and maintenance workshops.
|
THE EXPORT PROCESSING ZONES (BUSINESS SERVICES) REGULATIONS
1. |
Citation
These Regulations may be cited as the Export Processing Zones (Business Services) Regulations.
|
2. |
Interpretation
In these Regulations unless the context otherwise requires—
“business service permit” means an export processing zone business service permit issued pursuant to these Regulations;
“export processing zone business service” means a trade or business conducted by any individual, partnership, corporation or other entity conducting a trade or business within Kenya which is not an export processing zone enterprise.
|
3. |
Application procedure
Any person may apply for an export processing zone business service permit if the proposed business service—
(a) |
is set out in the First Schedule hereto as an eligible business service; and
|
(b) |
is carried out within an export processing zone.
|
|
4. |
Application for permit
An application for a permit to be issued under these Regulations shall contain the following information—
(a) |
the applicant’s particulars;
|
(b) |
the intended activity, which should be an eligible business service as set out in the First Schedule;
|
(c) |
evidence of prior business experience in the field within which the intended activity falls;
|
(d) |
the desired location of the proposed business service;
|
(f) |
details of ownership of the proposed business;
|
(g) |
details of jobs to be created; and
|
(h) |
the name and professional qualifications of the person who will be in charge of the day-to-day operations of the business.
|
|
5. |
Business plan
In addition to the particulars mentioned in regulation 4, the applicant shall submit to the Authority—
(a) |
(i) |
amounts of money to be invested in the said business; |
(ii) |
the expected sales turnover; |
(iii) |
operating expenses; and |
(iv) |
cash flow projections of the proposed business service; |
|
(b) |
certified copies of relevant professional, occupational or business licences where applicable.
|
|
6. |
Application form
An application for a business service permit shall be in the prescribed form set out in the Second Schedule to these Regulations.
|
7. |
Decision of Authority
The Authority shall evaluate the application for a business service permit and render its decision within thirty days from the date on which the completed application form and all the relevant additional information are received by the Authority.
|
8. |
Business Permit
A business service permit shall be in Form EPZ/BP set out in the Third Schedule to these Regulations.
|
9. |
Notification of change of particulars
(a) |
the holder of a business service permit ceases to carry on business to which it relates; or
|
(b) |
a change occurs in any particulars of the proposed business service, including ownership of the business, location, name or style under which the business is carried on,
|
the holder of the permit shall within fourteen days notify the Authority accordingly and furnish it with particulars of the change.
|
10. |
EPZ Business Permit fees
The Authority shall levy a Business Service Permit fee as set out in the Fourth Schedule to these Regulations.
|
11. |
Validity of permit
A permit issued under these regulations shall be valid for a period of one calendar year and shall be renewed for a like period upon payment of the prescribed fee.
|
12. |
Failure to use permit
Where the holder of a permit is unable to use the permit within three months from the date of issue thereof, the holder shall forthwith notify the Authority of the failure, giving reasons therefor, and the Authority shall, where satisfied with the reasons given, specify the period within which the holder shall comply with the terms of the permit.
|
13. |
Cancellation of permit
Where a period of three months from the date of issue of a permit has expired without the holder thereof performing the activities in accordance with the terms of the permit and no notification has been made in accordance with these Regulations, the permit shall lapse and shall be cancelled by the Authority.
|
14. |
Permit not transferable
A permit issued under these Regulations shall not be transferable to a third party.
|
FIRST SCHEDULE [r. 3 (a)]
ELIGIBLE BUSINESS SERVICES
[L.N. 13/2010, r. 2.]
PART A
All export processing zones
5. |
Postal and telecommunication bureau.
|
7. |
Courier and document handling.
|
8. |
Transportation services (freight and passenger).
|
9. |
Installation, repair and maintenance.
|
10. |
Fitness club, sports club and gymnasium.
|
11. |
Medical and related services.
|
12. |
Laboratory testing and quality certification services.
|
14. |
Business consultancy services (e.g. marketing, training, legal).
|
16. |
Other financial services.
|
17. |
Power generation and distribution services.
|
18. |
Water and sewerage services.
|
19. |
Telecommunication and telecommunication infrastructure services.
|
20. |
Internet services provision.
|
22. |
Grounds maintenance and landscaping.
|
23. |
Cleaning, pest control and sanitation.
|
24. |
Foreign trade missions (commercial trade offices).
|
25. |
International Disaster Relief Agencies.
|
26. |
International Non-Governmental Organizations.
PART B
Athi River Export Processing Zone Commercial Area (L.R. No. 18474/14)
|
1. |
Motor vehicle fuelling and maintenance services.
|
2. |
Retail Shops including produce market, dry cleaner, grocery shop, super market (selling non-EPZ goods).
|
4. |
Cinema, theatre, casino and other entertainment services.
|
5. |
Real estate agent, property developer and property manager.
|
6. |
Meetings, conventions and exhibitions.
|
7. |
Repair and maintenance workshops.
|
SECOND SCHEDULE [r. 6]
APPLICATION FOR AN EXPORT PROCESSING ZONES BUSINESS SERVICE PERMIT
THE EXPORT PROCESSING ZONES ACT
|
(Cap. 517)
|
|
Proposed business activity ...................................................................................
|
...................................................................................................................................
|
A. PARTICULARS OF APPLICANT/COMPANY
|
1.
|
(i)
|
Name of applicant .......................................................................................
|
|
(ii)
|
Address of Applicant ....................................................................................
|
|
(iii)
|
Telephone No. ..............................................................................................
|
|
(iv)
|
Fax No. ............................................................................................................
|
|
(v)
|
Previous business experience ...................................................................
|
2.
|
(i)
|
Name of entity which will undertake the business activity .......................
|
|
|
...............................................................................................................................
|
|
(ii)
|
Date of registration .........................................................................................
|
|
(iii)
|
Address of registered office .............................................................................
|
|
|
...........................................................................................................................
|
|
|
............................................................................................................................
|
|
|
|
B. PARTICULARS OF DIRECTORS/SOLE PROPRIETOR/PARTNERS
|
NAME
|
ID No./PASSPORT No.
|
NATIONALITY
|
SHAREHOLDING%
|
RESIDENTIAL ADDRESS
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
C.
|
PROJECT DETAILS
|
|
(i)
|
Main customer base of proposed business .............................................................................................................................................................................
|
|
(ii)
|
Proposed location/zone ................................................................................
|
|
(iii)
|
Space required (in sq. m.) ...............................................................................
|
|
|
|
D.
|
EMPLOYMENT
|
|
(i)
|
Proposed number of employees ..............................................................
|
|
(ii)
|
Name of Managing Director/General Manager and qualifications;.....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
|
|
|
|
E.
|
DECLARATION
|
|
I hereby declare that to the best of my knowledge and belief all the particulars furnished in this application are true.
|
|
|
|
|
...........................................................
|
|
|
Signature of Applicant
|
|
|
...........................................................
|
|
|
Name in Block Letters
|
|
|
...........................................................
|
|
|
Designation
|
Date ...........................
|
|
|
THIRD SCHEDULE [r. 8]
EXPORT PROCESSING ZONE BUSINESS SERVICE PERMIT
No. ....................
|
|
For the year ......................
|
REPUBLIC OF KENYA
|
THE EXPORT PROCESSING ZONES ACT
|
(Cap. 517)
|
EXPORT PROCESSING ZONES AUTHORITY
|
|
Export Protesting Zones Authority Grants this Business Service Permit:
|
Name of Applicant ............................................of ......................................
to engage in the EPZ business service of .................................................
..........................................................................................
at ........................................................................................
from ....................................................................................
Subject to the conditions attached herewith:
Dated ............................
|
|
..................................................
|
|
|
Chief Executive
|
FOURTH SCHEDULE [r. 10]
EPZ BUSINESS SERVICES FEES
1.
|
Application fees (non-refundable)
|
|
|
|
|
|
KSh.
|
|
(i) Sole proprietorship
|
|
2,000
|
|
(ii) Partnership
|
|
6,000
|
|
(iii) Companies
|
|
20,000
|
|
|
|
|
2.
|
Annual EPZ Business permit fees
|
|
|
|
|
|
KSh.
|
|
(i) Sole proprietorship
|
|
6,000
|
|
(ii) Partnership
|
|
10,000
|
|
(iii) Companies and privileged entities
|
|
20,000
|
|
|
|
|
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
[Revoked by L.N. 27/2014.]
THE EXPORT PROCESSING ZONES—REVOCATION OF DECLARATION
IN EXERCISE of the powers conferred by Section 15 (2) of the Export Processing Zones Act, the Cabinet Secretary, Ministry of Industrialization and Enterprise Development revokes the declaration of an Export Processing Zone made in respect of all the pieces of land being L.R. No. 17599/4, L.R. No. 17599/5 and L.R. 17599/6 measuring in total approximately 0.7206 hectares situated in the City of Nairobi along Nairobi-Kangundo Road.
Legal Notice No. 31 of 2005 is revoked.
THE DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for Trade declares the land specified in the Schedule hereto to be an Export Processing Zone.
SCHEDULE
All that piece of land being L.R. No. Ruiru/Township/241, measuring approximately 0.4882 hectare or thereabouts and L.R. No. Ruiru/Township/244 measuring approximately 0.7362 hectare of thereabouts, situated in Ruiru Township.
THE EXPORT PROCESSING ZONES—REVOCATION OF DECLARATION
IN EXERCISE of the powers conferred by section 15 (2) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development revokes the declaration of an export processing zone, made under Legal Notice No. 13 of 2000 in relation to property L.R. No. 18474, to the extent of and in respect of the subdivision thereof being all that piece of land known as L.R. No. 18474/227 measuring approximately 21.790 hectares situated in Mavoko Municipality in Machakos District.
THE REVOCATION OF DECLARATION
IN EXERCISE of the powers conferred by Section 15(2) of the Export Processing Zones Act, the Cabinet Secretary, Ministry of Industrialization and Enterprise Development revokes the declaration of an Export Processing Zone made in respect of all the pieces of land being L.R. No. 17599/4, L.R. No. 17599/5 and L.R. 17599/6 measuring in total approximately 0.7206 hectares situated in the City of Nairobi along Nairobi-Kangundo Road.
Legal Notice No. 31 of 2005 is revoked.
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development declares the parcel of land specified in the Schedule hereto to be an export processing zone.
SCHEDULE
All that piece of land being Title No. Kericho/Merigi/1216 measuring approximately 2.04 hectares or thereabout located in Bomet County.
THE REVOCATION OF DECLARATION
IN EXERCISE of the powers conferred by section 15(2) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development revokes the declaration of an export processing zone, made under Legal Notice No. 13 of 2000 in relation to property L.R. No. 18474, to the extent of and in respect of the subdivision thereof being all that piece of land known as L.R. No. 18474/227 measuring approximately 21.790 hectares situated in Mavoko Municipality in Machakos District.
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development declares the parcel of land specified in the Schedule hereto to be an export processing zone.
SCHEDULE
All that piece of land being subdivision No. MN/IV/1365 measuring approximately 1.429 hectares or thereabouts situated North of Mtwapa Creek in Kilifi County.
THE DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development declares the parcel of land specified in the Schedule hereto to be an export processing zone.
SCHEDULE
All that piece of land being Title No. Kericho/Merigi/1216 measuring approximately 2.04 hectares or thereabout located in Bomet County.
THE EXPORT PROCESING ZONES—DECLARATION OF EXPORT POCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development declares the land specified in the Schedule hereto to be an Export Processing Zone.
SCHEDULE
All that piece of land being Land Reference No. MN/IV/952 measuring approximately 2.428 hectares or thereabout situated in Mtwapa, Kilifi County.
THE EXPORT PROCESSING ZONES - DECLARATION
IN EXERCISE of the powers conferred by section 15 (1) of the the Export Processing Zones Act, the Cabinet Secretary for Industrization and Enterprise Development declares the land parcel specified in the Schedule hereto to be an Export Processing Zone.
SCHEDULE
All that piece of land being title No. Mombasa/Block XL VIII/45 (Part) measuring approximately 9 acres or thereabout situated in Mombasa County.
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development declares the parcels of the land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
All that piece of land being Land Reference No. Naivasha/Moi Ndabi/1152, measuring approximately 3.90 hectares or thereabout situated in Naivasha Sub-county, Nakuru County.
THE DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development declares the parcel of land specified in the Schedule hereto to be an export processing zone.
SCHEDULE
All that piece of land being subdivision No. MN/IV/1365 measuring approximately 1.429 hectares or thereabouts situated North of Mtwapa Creek in Kilifi County.
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development declares the the land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
All that piece of Land Reference No. 12610/167 (Original No. 12610/59/3) measuring approximately 1.412 hectares or thereabout situated East of Mavoko Municipality, Machakos County.
THE DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development declares the land specified in the Schedule hereto to be an Export Processing Zone.
SCHEDULE
All that piece of land being Land Reference No. MN/IV/952 measuring approximately 2.428 hectares or thereabout situated in Mtwapa, Kilifi County.
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development declares the the parcels of land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
All that piece of land being a portion of title No. 23399 measuring approximately 0.798 hectare or thereabouts situated in Naivasha Municipality, Nakuru County.
THE DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development declares the parcels of the land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
All that piece of land being Land Reference No. Naivasha/Moi Ndabi/1152, measuring approximately 3.90 hectares or thereabout situated in Naivasha Sub-county, Nakuru County.
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development declares the the land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
All that piece of land being Land Reference No. 5025/1230 measuring approximately 2.073 hectares or thereabout situated south of Takaungu, Kilifi County.
THE DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development declares the the land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
All that piece of Land Reference No. 12610/167 (Original No. 12610/59/3) measuring approximately 1.412 hectares or thereabout situated East of Mavoko Municipality, Machakos County.
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development declares the land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
All that piece of land being title No. Kericho/Cheptalal/2507, measuring approximately 3.563 hectares of thereabout, situated in Bomet County.
THE DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development declares the the parcels of land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
All that piece of land being a portion of title No. 23399 measuring approximately 0.798 hectare or thereabouts situated in Naivasha Municipality, Nakuru County.
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development declares the land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
All that piece of land being L.R. No. Gaturi/Weru/9730, 9731, 9732, 9733, 9734, 9735, 9737, 9739, 9740, 9741 and 9742, each measuring approximately 0.45 hectare or thereabouts, situated in Embu County.
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development declares the the land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
All that piece of land being Land Reference No. 5025/1230 measuring approximately 2.073 hectares or thereabout situated south of Takaungu, Kilifi County.
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development declares the the land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
All that piece of land being title No. Nakuru Municipality Block 16/156 and Title No. 16/157 measuring in total approximately 0.8776, hectares or thereabout, situated in Nakuru Municipality in Nakuru County.
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development declares the land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
All that piece of land being title No. Kericho/Cheptalal/2507, measuring approximately 3.563 hectares of thereabout, situated in Bomet County.
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development declares the the land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
All that piece of land being title No. Loc. 20/Mirira/5419 measuring approximately 2.855 hectares or thereabouts situated in Murang'a County.
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development declares the land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
All that piece of land being L.R. No. Gaturi/Weru/9730, 9731, 9732, 9733, 9734, 9735, 9737, 9739, 9740, 9741 and 9742, each measuring approximately 0.45 hectare or thereabouts, situated in Embu County.
THE EXPORT PROCESSING ZONES—REVOCATION OF DECLARATION
IN EXERCISE of the powers conferred by section 15 (2) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development revokes the declaration of an export processing zone made in respect of all that parcel of land being title No. Loc. 20/Mirira/1562, measuring approximately 2.05 hectares or thereabouts situated in Murang'a County.
THE DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development declares the the land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
All that piece of land being title No. Nakuru Municipality Block 16/156 and Title No. 16/157 measuring in total approximately 0.8776, hectares or thereabout, situated in Nakuru Municipality in Nakuru County.
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for the Industry, Trade and Co-operatives declares the parcels of land specified in the Schedule hereto to be an export processing zone.
SCHEDULE
All that parcel of land being Title No. CR. 59233 (Plot No.MN/III/8819) measuring in total approximately 1.165 hectares or thereabout situated in Kilifi County.
THE DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development declares the the land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
All that piece of land being title No. Loc. 20/Mirira/5419 measuring approximately 2.855 hectares or thereabouts situated in Murang'a County.
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for Industry, Trade and Co-operatives declares the parcels of land specified in the Schedule hereto to be export processing zone.
SCHEDULE
All the parcels of land being Title Nos. Kwale/Msambweni "A"/3107, 3108, 3109, 3110, 3353, 3370, 3371, 3515, 3575, 1350, 1329, 1352 and 2950 measuring in total approximately 18.98 hectares or thereabout situated in Kwale County.
THE REVOCATION OF DECLARATION
IN EXERCISE of the powers conferred by section 15(2) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization and Enterprise Development revokes the declaration of an export processing zone made in respect of all that parcel of land being title No. Loc. 20/Mirira/1562, measuring approximately 2.05 hectares or thereabouts situated in Murang'a County.
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for Industry, Trade and Co-operatives declares the parcel of land specified in the Schedule hereto to be an export processing zone.
SCHEDULE
All the parcels of land being Title No. Kwale/Ukunda S.S/592 measuring approximately 1.20 hectares or thereabout situated in Kwale County.
THE DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for the Industry, Trade and Co-operatives declares the parcels of land specified in the Schedule hereto to be an export processing zone.
SCHEDULE
All that parcel of land being Title No. CR. 59233 (Plot No.MN/III/8819) measuring in total approximately 1.165 hectares or thereabout situated in Kilifi County.
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for Industry, Trade and Co-operatives declares the parcel of land specified in the Schedule hereto to be an export processing zone.
SCHEDULE
All that piece of land being L.R. Transmara/Enaenyiey/969 measuring approximately 3.9 hectares or thereabout situated in Narok County.
THE DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for Industry, Trade and Co-operatives declares the parcels of land specified in the Schedule hereto to be export processing zone.
SCHEDULE
All the parcels of land being Title Nos. Kwale/Msambweni "A"/3107, 3108, 3109, 3110, 3353, 3370, 3371, 3515, 3575, 1350, 1329, 1352 and 2950 measuring in total approximately 18.98 hectares or thereabout situated in Kwale County.
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for Industry, Trade and Co-operatives declares the parcel of land specified in the Schedule hereto to be an export processing zone.
SCHEDULE
All that piece of land being L.R. No. 5876/2 measuring approximately 20 acres or thereabout, situated in Ndumberi, Kiambu County.
THE DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for Industry, Trade and Co-operatives declares the parcel of land specified in the Schedule hereto to be an export processing zone.
SCHEDULE
All the parcels of land being Title No. Kwale/Ukunda S.S/592 measuring approximately 1.20 hectares or thereabout situated in Kwale County.
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for Industry, Trade and Co-operatives declares the parcels of land specified in the Schedule hereto to be export processing zones.
SCHEDULE
All that parcel of land being Certificate of Lease No. Kwale/Shimoni/719 measuring approximately 1.31 Hectares or thereabout situated in Kwale County.
All that parcel of land being Certificate of Lease No. Kwale/Shimoni/783 measuring approximately 2.6 Hectares or thereabout situated in Kwale County.
All that parcel of land being Certificate of Lease No. Kwale/Shimoni/403 measuring approximately 5.37 Hectares or thereabout situated in Kwale County.
THE DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for Industry, Trade and Co-operatives declares the parcel of land specified in the Schedule hereto to be an export processing zone.
SCHEDULE
All that piece of land being L.R. Transmara/Enaenyiey/969 measuring approximately 3.9 hectares or thereabout situated in Narok County.
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for Industry, Trade and Co-operatives declares the parcel of land specified in the Schedule hereto to be an export processing zone.
SCHEDULE
All that piece of land being Title No. NgandoriIKirigi/3925 measuring approximately 1.21 Hectares or thereabout situated in Embu County.
THE DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for Industry, Trade and Co-operatives declares the parcel of land specified in the Schedule hereto to be an export processing zone.
SCHEDULE
All that piece of land being L.R. No. 5876/2 measuring approximately 20 acres or thereabout, situated in Ndumberi, Kiambu County.
THE EXPORT PROCESSING ZONES—REVOCATION OF DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15 (2) of the Export Processing Zones Act, the Cabinet Secretary for Industry, Trade and Co-operatives revokes* the declaration of the Export Processing Zones specified in respect of all that parcels of land being L.R. No. 12239 (Original No. 9357/4) Malindi measuring approximately 2.118 Hectares situated in Malindi.
*L.N. 118/2009
THE DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for Industry, Trade and Co-operatives declares the parcels of land specified in the Schedule hereto to be export processing zones.
SCHEDULE
All that parcel of land being Certificate of Lease No. Kwale/Shimoni/719 measuring approximately 1.31 Hectares or thereabout situated in Kwale County.
All that parcel of land being Certificate of Lease No. Kwale/Shimoni/783 measuring approximately 2.6 Hectares or thereabout situated in Kwale County.
All that parcel of land being Certificate of Lease No. Kwale/Shimoni/403 measuring approximately 5.37 Hectares or thereabout situated in Kwale County.
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for Industry, Trade and Enterprise Development declares the land specified in the Schedule hereto to be an Export Processing Zone.
SCHEDULE
All that piece of land known as portion X on the L.R. No. 29437/76 measuring approximately 1.03 acres situated in Bonje Area, Kwale County.
THE DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for Industry, Trade and Co-operatives declares the parcel of land specified in the Schedule hereto to be an export processing zone.
SCHEDULE
All that piece of land being Title No. Ngandori/Kirigi/3925 measuring approximately 1.21 Hectares or thereabout situated in Embu County.
THE EXPORT PROCESSING ZONES-DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization, Trade and Enterprise Development declares the land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
All that piece of land known as MN/III/821 measuring approximately 1.079 Hectares situated in North of Mtwapa Creek, Kilifi County.
THE REVOCATION OF DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(2) of the Export Processing Zones Act, the Cabinet Secretary for Industry, Trade and Co-operatives revokes* the declaration of the Export Processing Zones specified in respect of all that parcels of land being L.R. No. 12239 (Original No. 9357/4) Malindi measuring approximately 2.118 Hectares situated in Malindi.
*L.N. 118/2009
THE EXPORT PROCESSING ZONES - DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for Industry, Trade and Enterprise Development declares the land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
ALL THAT parcel of land situate in Changamwe—Miritini in Mombasa County measuring approximately 10.30 acres or thereabout known as Plot Number MN/VI/678.
THE DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industry, Trade and Enterprise Development declares the land specified in the Schedule hereto to be an Export Processing Zone.
SCHEDULE
All that piece of land known as portion X on the L.R. No. 29437/76 measuring approximately 1.03 acres situated in Bonje Area, Kwale County.
THE EXPORT PROCESSING ZONES—DECLARATION OF EXPORT PROCESSING ZONES
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialisation, Trade and Enterprise Development declares the land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
All that parcel of land known as Title Number Nyaki/Giaki/60 situated within Giaki, Imenti North Sub-County in Meru County measuring approximately 6.22 Hectares or thereabout.
THE DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization, Trade and Enterprise Development declares the land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
All that piece of land known as MN/III/821 measuring approximately 1.079 Hectares situated in North of Mtwapa Creek, Kilifi County.
THE DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for Industry, Trade and Enterprise Development declares the land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
ALL THAT parcel of land situate in Changamwe—Miritini in Mombasa County measuring approximately 10.30 acres or thereabout known as Plot Number MN/VI/678.
THE EXPORT PROCESSING ZONES - DECLARATION
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization, Trade and Enterprise Development declares the land specified in the Schedule hereto to be an export processing zone.
SCHEDULE
All that parcel of land known as Title Number Thika Municipality Block 6/1072 situated in Thika Sub-County in Kiambu County measuring approximately 0.9954 hectares or thereabouts.
THE DECLARATION OF EXPORT PROCESSING ZONES
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialisation, Trade and Enterprise Development declares the land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
All that parcel of land known as Title Number Nyaki/Giaki/60 situated within Giaki, Imenti North Sub-County in Meru County measuring approximately 6.22 Hectares or thereabout.
THE EXPORT PROCESSING ZONES - DECLARATION
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization, Trade and Enterprise Development declares the land specified in the Schedule hereto to be an Export Processing Zone.
SCHEDULE
ALL THAT parcel of land known as a portion of L.R. No. Kilifi/Mtwapa/2443, measuring approximately 0.40 Hectares, situated in Kikambala, Kilifi County.
THE EXPORT PROCESSING ZONES - DECLARATION
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization, Trade and Enterprise Development declares the land specified in the Schedule hereto to be an Export Processing Zone.
SCHEDULE
ALL THAT space on a building known as Block D on L.R. No. 12081/10, measuring approximately Seventy Thousand Eight Hundred and Two (70,802) square feet, situated along Mombasa Road, Nairobi County.
THE EXPORT PROCESSING ZONES - DECLARATION
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization, Trade and Enterprise Development declares the land specified in the Schedule hereto to be an Export Processing Zone.
SCHEDULE
ALL THAT parcel of land measuring Seventy-three thousand (73000) square feet, being a part of Land Title No. Kwale/Mwavumbo/177, situate in Mariakani, Kwale County.
THE EXPORT PROCESSING ZONES - DECLARATION
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization, Trade and Enterprise Development declares the land specified in the Schedule hereto to be an Export Processing Zone.
SCHEDULE
ALL THAT piece of land known as a Portion of L.R. No. Kiine/Rukanga/7446, measuring approximately 2.05 Hectare or thereabout, situate in Sagana, Kirinyaga County.
THE EXPORT PROCESSING ZONES - REVOCATION OF DECLARATION
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization, Trade and Enterprise Development revokes the declaration of the Export Processing Zones specified in respect of all that parcel of land being L.R. No. Kericho/Manaret S S/1195, measuring approximately 3.798 Hectares or thereabout situate in Bureti, Bomet County.
THE DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15 (1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization, Trade and Enterprise Development declares the land specified in the Schedule to be an Export Processing Zone.
SCHEDULE
ALL THAT parcel of land known as a portion of a Warehouse situated on a building on Land Title No. Mombasa/Block/1/268 measuring approximately nought decimal one three (0.13) hectares, situated in Shimanzi Area, Mombasa County.
THE DECLARATION OF EXPORT PROCESSING ZONE
IN EXERCISE of the powers conferred by section 15(1) of the Export Processing Zones Act, the Cabinet Secretary for Industrialization, Trade and Enterprise Development declares the land specified in the Schedule to be an export processing zone.
SCHEDULE
All that parcel of land and buildings on Land Title Numbers Kilifi/Mtwapa/5413, 5414, 4752, 5157, 940 and 2784 measuring approximately one decimal three four six four (1.3464) hectares situated within Mtwapa, Kilifi County.
|